Active Solicitation · DEPT OF DEFENSE

    USAFA VARSITY BASEBALL STADIUM

    Sol. W9128F26SM017Sources SoughtOMAHA, NE
    Open · 30d remaining
    DAYS TO CLOSE
    30
    closes Jun 12, 2026
    POSTED
    May 12, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1FB
    Product & service classification

    AI Summary

    The Department of Defense is seeking contractors for the construction of a new baseball stadium at the USAF Academy. The project includes building new grandstands, press box, restrooms, and team facilities, along with demolition of existing structures. The total area to be reconstructed is approximately 10,000 SF, with additional access road construction for maintenance and emergency vehicles.

    Contract details

    Solicitation No.
    W9128F26SM017
    Notice Type
    Sources Sought
    Posted Date
    May 12, 2026
    Response Deadline
    June 12, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1FB
    Issuing Office
    W071 ENDIST OMAHA
    Primary Contact
    Sarah Martin
    City
    OMAHA
    State
    NE
    ZIP Code
    68102-4901
    AI Product/Service
    both

    Description

    This project will consist of construction on a new baseball stadium at Erdle Field, at The USAF Academy, to create a functional and accessible modern stadium to meet NCAA baseball stadium requirements associated with intercollegiate operations. The existing Press Box and Dugouts will be eliminated to build new concrete grandstands, press box, restrooms, concessions, dugouts, and home team facilities. The home team facilities include a new locker room, showers and restroom for the USAFA baseball team, a replay booth, and a lounge space, a new locker room for the USAFA baseball coaching staff with showers and restrooms, a satellite sports medicine training room, and an equipment mud room attached to the first base dugout. Construction will consist of concrete slab on grade and seat risers on grade, concrete retaining walls, structural steel framing with steel roof deck, exterior masonry load-bearing walls, concrete foundations, and concrete columns and roof structures. Scope also includes demolition of the 1,000 SF press box and dugouts. Total building area to be reconstructed is about 10,000 SF. Limited work will be done on the existing baseball field. Construction of a new access road entering the site from the east roadway will provide maintenance and emergency vehicle access to playing field level. Please see the attached document for full details.

    Key dates

    1. May 12, 2026Posted Date
    2. June 12, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    USAFA VARSITY BASEBALL STADIUM is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.