Closed Solicitation · DEPARTMENT OF HOMELAND SECURITY

    USCG KETCHIKAN ELECTRICAL WORK

    Sol. PierOneBaseKetchikanCombined Synopsis/SolicitationSet-aside: No Set aside usedKETCHIKAN, AK
    Closed
    STATUS
    Closed
    closed Mar 13, 2026
    POSTED
    Feb 26, 2026
    Publication date
    NAICS CODE
    238210
    Primary industry classification
    PSC CODE
    J059
    Product & service classification

    AI Summary

    The US Coast Guard is seeking proposals for electrical inspection and maintenance services at Floating Pier One, Base Ketchikan. The work includes inspecting and repairing shore tie terminals and electrical lines, with a focus on safety and compliance. Proposals are due by February 26, 2026, at 3:00 PM Alaska time.

    Contract details

    Solicitation No.
    PierOneBaseKetchikan
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    No Set aside used
    Posted Date
    February 26, 2026
    Response Deadline
    March 13, 2026
    NAICS Code
    238210AI guide
    PSC / Class Code
    J059
    Contract Code
    7008
    Issuing Office
    BASE KETCHIKAN(00035)
    Sub-Agency
    US COAST GUARD
    Primary Contact
    DENO STAMOS
    State
    AK
    ZIP Code
    99901
    AI Product/Service
    service

    Description

    EXTENDED PROPOSAL DUE DATE OUT TO 13 MARCH 2026 AT 3:00 PM ALASKA TIME SEE ATTACHED SPECS/SCOPE OF WORK---- Scope of Work: Electrical Inspection and Maintenance – Floating Pier One, Base Ketchikan 1. Objective: Provide inspection, maintenance, and repair services for electrical systems associated with Floating Pier One, Base Ketchikan, with a focus on shore tie terminals and associated electrical lines. 2. Location: Floating Pier One, Base Ketchikan. Berth 5 3. Tasks: A. Shore Tie Terminal Maintenance Inspect all shore tie terminals where vessels connect to shore power. Identify and document any damage, corrosion, moisture intrusion, or other deficiencies. Repair any identified issues to restore full functionality. Dry and seal all shore tie terminals to prevent future moisture intrusion. Test terminals for proper operation after repairs and sealing. B. Electrical Line Inspection and Grooming Inspect the electrical line running from the FRC Floating Pier Isolation Transfer to the shore tie terminals. Clean and groom all accessible portions of the line, removing debris, corrosion, and contaminants. Conduct a thorough inspection for physical damage, wear, or potential failure points. Perform Megger (insulation resistance) testing on the electrical lines to identify any insulation breakdowns or other potential issues. Document all findings and provide recommendations for further action if required. 4. Deliverables: Written inspection report detailing findings, repairs performed, and recommendations for future maintenance. Documentation of Megger test results and any corrective actions taken. Photographic evidence of before and after conditions for all work performed. 5. Period of Performance: Shore Tie Terminal inspection and maintenance shall be completed within two (2) weeks from award of contract. Electrical line inspection, grooming, and cleaning shall be completed within three (3) weeks from award of contract. Final written report of findings and actions written(typed) and documented shall be submitted within one (1) month from the start of the period of performance. 6. Safety and Compliance: All work must comply with applicable electrical codes, safety standards, and Base Ketchikan requirements. All personnel must be appropriately licensed and qualified for marine electrical work. Quote/Estimate: Quote or Estimate shall include materials going up to 5,000K for any repairs in the shore tie terminal box on the floating pier, but not to exceed. Question: Could you quantify the shore tie terminals and cable lengths from Isolation Transfer to each Terminal to refine labor/testing time. answer to a contractors question 1. Good Afternoon Contracting Team, The Shore tie Terminals is one box that has two plugs for shore ties. Approximate size is 4’x4’x2’ Not exact size of the box, but approximate. Approximate distance of the cable/ conduit run is 550’ plus or mins 20 feet. Area of Concern: On map, it is South Float One (Berth 5 and Berth 10). Base Ketchikan POC: LT Robert Marx and CWO Russell Dever. ***contact Senior Field Contracting Officer (SFCO ) DENO STAMOS AT deno.a.stamos@uscg.mil if a site walk is required . THIS IS A COMBINED SYNOPSIS SOLICIATION. RECEIPT OF BIDS VIA EMAIL IS DUE NO LATER THAN 26 FEBRUARY 2026 AT 3:00 PM ALASKA TIME ZONE, NAICS CODE: 238210 FSC CODE:J059

    Key dates

    1. February 26, 2026Posted Date
    2. March 13, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    USCG KETCHIKAN ELECTRICAL WORK is a federal acquisition solicitation issued by DEPARTMENT OF HOMELAND SECURITY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.