Closed Solicitation · DEPARTMENT OF HOMELAND SECURITY
AI Summary
The USCGC STONE requires a contractor to perform a re-tube of the B side condenser due to failure caused by saltwater intrusion. The work must comply with Coast Guard specifications and is to be completed between March 31 and April 13, 2026. The contractor may work at their facility within 1000 miles of the USCG base in North Charleston, SC.
General Requirements
USCGC STONE is currently experiencing a failure of the B side condenser on the #1 A/C skid. The condenser failed causing saltwater intrusion through the entire B side of the system. The condenser provides vital redundancy to the cooling system for electronics support equipment critical to the operation of their mission.
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.3 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified.
3.4 Period of Performance. The period of performance for this requirement starts on 31 MAR 2026 and ends on 13 APR 2026.
3.5 Location. Condenser is currently located at USCG base in North Charleston, SC. The contractor may perform the required work at their repair facilities, if the facility is within 1000 miles of the CG base. The CG will ship the condenser to the contractor’s facility. Contractor is responsible for returning condenser to the following address. USCGC STONE, 1050 Register St, North Charleston SC 29405.
3.6 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work.
3.7 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following:
3.7.1 SFLC-LREPL Asset Manager, LTJG Justin Waters, Justin.l.waters@uscg.mil
USCGC STONE AC CONDENSER RE-TUBE is a federal acquisition solicitation issued by DEPARTMENT OF HOMELAND SECURITY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.