Closed Solicitation · DEPARTMENT OF HOMELAND SECURITY
AI Summary
The US Coast Guard requires a Bosch Rexroth authorized technician for one day to diagnose the 2B Steering pump on the CGC Stone at Base Charleston. The work is scheduled between May 26 and June 3, 2026, and is strictly for inspection and reporting, with no repairs allowed.
Scope of Work: CGC Stone- Discrep 26029
PR- 52000PR260025256
Last update 05/19/26
Background:
2B Steering pump lags from 2A when turning in either direction. ASSIST has helped troubleshoot and now the rudder is a bit faster but still lagging significantly while turning. Currently the Cutter only has 1 out of 4 pumps correctly operating which significantly impacts their ability to safely maneuver.
Statement of Work:
Vendor to provide one technician, must be a Bosch Rexroth authorized technician, for 1 day of work to troubleshoot 2B Steering pump while CGC Stone is at Base Charleston. Work must be performed between 26MAY26-03JUN26. This will be an inspection, troubleshooting/diagnosis, and reporting only. The technician is not authorized to perform any repairs, adjustments, or parts replacement.
Service:
POP: 26MAY26-03JUN26
Address:
CGC Stone
1050 Register St
North Charleston, SC, 29405
On‑scene coordination POC
Stephen Horvath
858-776-7767
Stephen.B.Horvath@uscg.mil
Technical Product Line POC
Christian Thorn
(510) 437-5483
Christian.P.Thorn@USCG.MIL
USCGC STONE STEERING PUMP DIAGNOSIS (NO REPAIR) is a federal acquisition solicitation issued by DEPARTMENT OF HOMELAND SECURITY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.