Closed Solicitation · DEPT OF DEFENSE

    USS BLUE RIDGE 5C1 DSRA TYCOM 5

    Sol. N6264925RA054SolicitationFPO, AP
    Closed
    STATUS
    Closed
    closed Jun 30, 2025
    POSTED
    May 30, 2025
    Publication date
    NAICS CODE
    336611
    Primary industry classification
    PSC CODE
    J999
    Product & service classification

    AI Summary

    The Department of Defense is soliciting bids for the repair, maintenance, and overhaul of the USS BLUE RIDGE (LCC-19) during its Docking-Selected Restricted Availability (DSRA). The project includes 13 Task Group Instructions and various testing phases, requiring contractors to manage labor, quality control, and safety. The contract period is from January 12, 2026, to May 15, 2027, with proposals due by June 30, 2025. Interested bidders should request additional reference materials via email.

    Contract details

    Solicitation No.
    N6264925RA054
    Notice Type
    Solicitation
    Posted Date
    May 30, 2025
    Response Deadline
    June 30, 2025
    NAICS Code
    336611AI guide
    PSC / Class Code
    J999
    Primary Contact
    Miwa Takahashi
    City
    FPO
    ZIP Code
    96349-1500
    AI Product/Service
    service

    Description

    The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC).  The work is composed of 13 Task Group Instructions (TGIs) with eight (8) Test Phases of various ship repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion.

    The anticipated contractual Period of Performance (POP) is 12-Jan-2026 through 15-May-2027.

    Due to some technical difficulties, Task Group Instructions (TGIs) currenlty cannot be uploaded to SAM. Gov.  Please kindly check the following TGIs and its descriptions for your reference. 

    3819P25501-A01: SHIP ALTERATION (SA) 80992K, MODIFICATION OF DEAERATING FEED TANK SIGHTGLASS INDICATOR DRAIN PIPING; ACCOMPLISH

    3819P49501-A01: SA 82269K, LCC 19 ESLP N7 THEATER SECURITY COOPERATION OFFICE; ACCOMPLISH

    3819P49501-T01: VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEM, SA 82269K

    3819P49501-T02: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS

    3819P51206-A01: SA 80964K, ACCOMPLISH AIR CONDITIONING LOAD CENTER 1-4; ACCOMPLISH

    3819P51206-T01: TIGHTNESS AND OPERATIONAL TEST FOR CHILL WATER SYSTEM

    3819P51206-T02: TIGHTNESS AND OPERATIONAL TEST FOR HEATING SYSTEM SA 80964K

    3819P51206-T03: OPERATIONAL, VOLUMETRIC, AND BALANCE TEST FOR VENTILATION SYSTEM

    3819P51206-T04: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT

    3819P51206-T05: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT

    3819P51206-T07: OPERATIONAL TEST WITH VIB-CUT AND VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEMS

    3819P52302-A01: SA 81205K, MODIFICATION OF COUNTERMEASURE WASHDOWN (CMWD) PIPING;
    ACCOMPLISH

    3819P52302-T01: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS, SA 81205K

    3819P52601-A01: SCD 11176K, MODIFICATION OF FORECASTLE DECK DRAIN AND PIPING; ACCOMPLISH

    OFFER: Offerors must provide all information required by this solicitation not later than 30 Jun 2025 at 10:00AM Japan Standard Time (JST).

    References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.

    Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil)

    When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001.

    When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022.

    If there is a time limit on your offer, you must specify this at submission of your proposal.

    If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section.

    Key dates

    1. May 30, 2025Posted Date
    2. June 30, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    USS BLUE RIDGE 5C1 DSRA TYCOM 5 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.