Closed Solicitation · DEPT OF DEFENSE
AI Summary
The opportunity involves the complete removal and replacement of the bridge railing and posts at Weeks Brook Bridge, including installation per New Hampshire Department of Transportation standards. The project is set aside for small businesses, with a construction magnitude between $25,000 and $100,000. Active SAM.gov registration is required for submission.
THE WORK CONSISTS OF: The Contractor shall furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes the installation of a new railing system, anchored to the superstructure as detailed in the contract drawings. The new railing posts and guardrails shall conform to the standard details and specifications of the New Hampshire Department of Transportation (NHDOT). However, the connections of these components to the existing bridge superstructure shall be executed in accordance with the project-specific designs. The magnitude of construction is between $25,000 and $100,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil) This procurement is set-aside for small business vendors. The applicable NAICS code is 237310 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.