Closed Solicitation · DEPT OF DEFENSE

    WESTPORT HARBOR MA, MAINTENANCE DREDGING

    Sol. W912WJ24B0010SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)CONCORD, MA
    Closed
    STATUS
    Closed
    closed Aug 22, 2024
    POSTED
    Jul 22, 2024
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1QA
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers, New England District, will soon release an Invitation for Bids (IFB) for maintenance dredging at Westport Harbor in Massachusetts. This opportunity is reserved for small businesses. The NAICS code for this project is 237990, with a size standard of $37 million. The estimated construction cost and further details will be provided in the upcoming solicitation.

    Contract details

    Solicitation No.
    W912WJ24B0010
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 22, 2024
    Response Deadline
    August 22, 2024
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1QA
    Contract Code
    2100
    Primary Contact
    Natalie Allen
    State
    MA
    ZIP Code
    01742-2751

    Award information

    Awardee
    null
    Award Date

    Description

    The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for maintenance dredging of the Federal Navigation Project (FNP) at Westport Harbor located in Westport, Massachusetts. This solicitation will be set aside for small business interests. The NAICS code for this procurement is 237990 with a size standard of $37M. The estimated construction cost is expected to range from $1,000,000 - $5,000,000.The project consists of maintenance dredging by mechanical means to remove approximately 65,000 – 75,000 cubic yards (cy) of clean sand from several areas in the authorized, 9 foot deep by 150 to 200 feet wide, outer entrance channel feature of the FNP. Dredging in the channel will be to a maximum elevation of -10’ Mean Lower Low Water (MLLW). The dredged material will be hauled approximately 2 nautical miles from the dredging areas and placed at a Westport Harbor Nearshore Placement Site off Horseneck Beach. The dredging and dredged material placement work is expected to take 3 - 4 months to complete. The available work window for the dredging and placement of dredged material is from 15 September 2024 to 15 January 2025.

    Key dates

    1. July 22, 2024Posted Date
    2. August 22, 2024Proposals / Responses Due

    Frequently asked questions

    WESTPORT HARBOR MA, MAINTENANCE DREDGING is a federal contract award from DEPT OF DEFENSE. Review the award details including the awardee, contract value, and NAICS code.