Active Solicitation · DEPARTMENT OF THE INTERIOR

    Y--Boat Ramp Replacement Project at Kirwin NWR

    Sol. 140FGA26R0023PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Falls Church, VA
    Open · 38d remaining
    DAYS TO CLOSE
    38
    closes Jul 31, 2026
    POSTED
    Jun 18, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1PZ
    Product & service classification

    AI Summary

    The Boat Ramp Replacement Project at Kirwin NWR is a firm-fixed price contract set aside for small businesses. The project, with a magnitude between $500K and $1M, requires contractors to be registered in SAM. The solicitation is expected to be posted on July 1, 2026, with a performance period of 60 days after receipt of the Notice to Proceed.

    Contract details

    Solicitation No.
    140FGA26R0023
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 18, 2026
    Response Deadline
    July 31, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1PZ
    Contract Code
    1448
    Issuing Office
    FWS, GAOA
    Primary Contact
    Coleman, Justine
    State
    VA
    ZIP Code
    22041
    AI Product/Service
    service

    Description

    Project Description: Boat Ramp Project at Kirwin NWR Location: Kirwin NWR (National Wildlife Refuge) 702 E. Xavier Road Kirwin, KS 67644 Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete online representations and certifications before the solicitation response due date. Solicitation is expected to be posted on July 1, 2026. This project will be set aside for small businesses only. Contract Type: Firm-Fixed Price Project Magnitude: Between $500K and $1M Period of Performance: 60 Days After Receipt of NTP Bonds: A bid bond is not required. Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000.00 requires both payment and performance bonds. Bonds are due no later than 10 calendar days after award. Due to the project magnitude, both payment and performance bonds will be required. Basis for Award: Tradeoff - Best Value

    Key dates

    1. June 18, 2026Posted Date
    2. July 31, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Y--Boat Ramp Replacement Project at Kirwin NWR is a federal acquisition solicitation issued by DEPARTMENT OF THE INTERIOR. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.