    The Bureau of Reclamation is seeking information for a future construction project at Glen Canyon Powerplant involving the installation of new transformers and associated electrical work. This Sources Sought notice is for market research only and does not constitute a solicitation. Interested firms should submit their capabilities and relevant experience by May 1, 2026.

    Contract details

    Solicitation No.
    140R4026R0015
    Notice Type
    Sources Sought
    Posted Date
    March 31, 2026
    Response Deadline
    May 1, 2026
    NAICS Code
    237130AI guide
    PSC / Class Code
    Y1MD
    Primary Contact
    Laughbon, Lisa
    State
    UT
    ZIP Code
    84138
    AI Product/Service
    service

    Description

    Department of the Interior
    Bureau of Reclamation – Upper Colorado Region
    Glen Canyon Powerplant and Lake Powell Switchyard

    NOTICE TYPE: Sources Sought (Market Research)

    NAICS: 237130 – Power and Communication Line and Related Structures Construction

    PSC: Y1MD Construction of Electrical Installations and Power Plants

    1. NOTICE DESCRIPTION

    This Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10.

    This is NOT a solicitation, request for proposal, bid, or quote.
    No contract will be awarded from this notice. No reimbursement will be provided for costs associated with responding.

    Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36.

    2. PROJECT LOCATION

    Glen Canyon Powerplant and Lake Powell Switchyard
    Glen Canyon Dam
    Coconino County, Arizona (approx. 2 miles northwest of Page, AZ)

    3. PROJECT OVERVIEW

    The Bureau of Reclamation anticipates a construction requirement to furnish and install three (3) outdoor, three-phase station service transformers and perform associated electrical, protection, and structural work.

    4. PRINCIPAL COMPONENTS OF WORK

    A. Transformer Removal and Replacement

    Removal and disposal of two (2) existing station service transformers.

    Furnishing, installing, and commissioning three (3) new transformers:

    Two (2) transformers:
    • 3phase outdoor stepdown
    • 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
    • 60 Hz
    • High side: 13.8 kV, 150 kV BIL
    • Low side: 4.16 kV, 75 kV BIL
    • 6.5% impedance on 3.75 MVA
    • Tap changer: ±2.5%, 5%
    • Insulating fluid: Natural ester

    One (1) transformer:
    • 3phase outdoor stepdown
    • 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
    • 60 Hz
    • High side: 25 kV, 150 kV BIL
    • Low side: 4.16 kV, 75 kV BIL
    • 6.5% impedance on 3.75 MVA
    • Tap changer: ±2.5%, 5%
    • Insulating fluid: Natural ester

    B. Additional Electrical & Structural Modifications

    • Install new neutral grounding resistors.
    • Remove/replace nonsegregated bus on lowside of two transformers.
    • Modify highside isolatedphase bus.
    • Furnish and install one (1) interrupter switch.
    • Remove two (2) existing transformer protection relays; install three (3) new relays.
    • Install six (6) current transformers.
    • Remove existing concrete containment; install three (3) new containment systems.
    • Remove/install 5 kV cable through powerplant.
    • Remove/install approx. 2,000 LF of 25 kV armored cable via tunnel and underground conduit.
    • Install three (3) singlepole fused disconnect switches.
    • Remove and replace three (3) surge arresters.


    5. ESTIMATED MAGNITUDE OF CONSTRUCTION
    Between $10,000,000 and $25,000,000

    6. ANTICIPATED PERIOD OF PERFORMANCE
    • Period of Performance: TBD
    • Anticipated Contract Award: 2nd Quarter FY 2027

    7. SUBMISSION REQUIREMENTS

    Interested and capable firms are requested to submit the following:

    Company Information
    • Name, physical address, UEI, points of contact, phone, and email.

    Business Size & SBA Program Status under NAICS 237130 and 335311
    • Indicate Small Business, HUBZone, 8(a), SDVOSB, WOSB, SDB, or Large Business.
    • SBA certification must be verifiable in SAM.gov.

    Capabilities Statement
    • Demonstrate relevant experience and capability to perform all required work.

    Transformer Manufacturer Information
    • Manufacturer name and country of origin.
    • Documentation supporting compliance with FAR 52.2255 (Trade Agreements) and/or 52.22511 (Buy American – Construction Materials).

    Estimated Transformer Lead Time
    • Assume NTP = January 25, 2027 for market research purposes.

    Market Conditions & Economic Price Adjustment Input
    • Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable.

    Transformer Pricing Indices Used
    • Identify indices commonly applied for transformers with these characteristics.

    Bonding Capacity
    • Provide aggregate and single project bonding limits.

    8. RESPONSE DELIVERY
    Email responses only to:
    Lisa Laughbon
    Contracting Officer
    Email: lisa_laughbon@ios.doi.gov

    Response Deadline: COB 5/1/2026

    Key dates

    1. March 31, 2026Posted Date
    2. May 1, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Y--GLEN CANYON POWERPLANT AND LAKE POWELL SWITCHYARD is a federal acquisition solicitation issued by DEPARTMENT OF THE INTERIOR. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.