Active Solicitation · DEPARTMENT OF THE INTERIOR

    Y--GOGA 244458 & FOPO 186401 CONSTRUCT BIKE PATH AT WEST BLUFF TRAILHEAD AND LONG

    Sol. 140P2026R0066Sources SoughtDENVER, CO
    Open · 12d remaining
    DAYS TO CLOSE
    12
    closes May 5, 2026
    POSTED
    Apr 21, 2026
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Department of the Interior is seeking sources for constructing a bike path at West Bluff Trailhead and improving Long Avenue. The project includes roadway enhancements, retaining walls, and pedestrian safety features to alleviate traffic congestion. Interested parties should respond to this sources sought notice by the specified deadline.

    Contract details

    Solicitation No.
    140P2026R0066
    Notice Type
    Sources Sought
    Posted Date
    April 21, 2026
    Response Deadline
    May 5, 2026
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Cahill, Samantha
    City
    DENVER
    State
    CO
    ZIP Code
    80225
    AI Product/Service
    both

    Description

    The project entails roadway and pathway improvements intended to accommodate cyclists and pedestrians in an area congested with vehicle traffic. The project includes construction of a new paved bike path along the perimeter of the West Bluff Trailhead parking area and improvements to Long Avenue to accommodate an uphill bike lane. The project will construct a vehicle turnaround at the north/west terminus of the West Bluff Trailhead parking area to facilitate vehicle movements and relieve traffic congestion.

    Approximately 1,100¿ of new bike path will be constructed adjacent to the trailhead parking area. Several small retaining walls will be built to make room for the new path at the toe of the hillside. Existing light poles and electrical vehicle charging stations will be relocated to accommodate the bike path improvements.

    Long Avenue is approximately 1,200¿ in length and consists of two (2) travel lanes and no shoulders. Where existing roadway bench is sufficient, the project will widen the roadway to accommodate an uphill bike lane. Guardrails and chain-link fencing will be replaced along the roadway shoulder. An historic masonry drainage ditch along the roadway shoulder will be reconstructed.

    The intersection of Long Avenue and Marine Drive and adjacent plaza area behind the Warming Hut and neighboring buildings will be reconstructed to accommodate the bike path, gated access for administrative vehicles, and pedestrian safety improvements.

    Key dates

    1. April 21, 2026Posted Date
    2. May 5, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Y--GOGA 244458 & FOPO 186401 CONSTRUCT BIKE PATH AT WEST BLUFF TRAILHEAD AND LONG is a federal acquisition solicitation issued by DEPARTMENT OF THE INTERIOR. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.