Closed Solicitation · DEPARTMENT OF ENERGY

    Y--YELLOWTAIL SWITCHYARD DCS PHASE I PRE-FABRICATED BUILDING AND CONSTRUCTION

    DEPARTMENT OF ENERGY
    Sol. 89503225BWA000069PresolicitationLOVELAND, CO
    Closed
    STATUS
    Closed
    closed Jul 25, 2025
    POSTED
    May 29, 2025
    Publication date
    NAICS CODE
    237130
    Primary industry classification
    PSC CODE
    Y1PZ
    Product & service classification

    AI Summary

    The Department of Energy is seeking bids for the Yellowtail Switchyard DCS Phase I project, which involves demolishing an existing building and constructing a new pre-fabricated facility. Key tasks include replacing and rotating power circuit breakers, removing various structures, and installing new equipment in compliance with safety standards. Bidders must submit proposals exclusively via FedConnect, as email submissions will not be accepted. The deadline for bids is July 25, 2025.

    Contract details

    Solicitation No.
    89503225BWA000069
    Notice Type
    Presolicitation
    Posted Date
    May 29, 2025
    Response Deadline
    July 25, 2025
    NAICS Code
    237130AI guide
    PSC / Class Code
    Y1PZ
    Primary Contact
    Pratt, John W.
    State
    CO
    ZIP Code
    80538
    AI Product/Service
    both

    Description

    NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted.

    The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project.

    Yellowtail Switchyard DCS Phase I priniciple components of work include demolishing of existing building, providing a new pre-fabricated building, complying with all applicable safety requirements contained in WAPA's Construction Standard 1 and OSHA Standards, replacing five (5) 230-kV power circuit breakers including their concrete foundations, rotating six (6) 115-kV power circuit breakers 180 degrees, replacing four (4) 115-kV power circuit breaker concrete foundations, removing six (6) pothead steel structures, removing two (2) disconnect switches (steel only), removing eighteen (18) bus poles and their foundations, removing two (2) lighting units and their foundations, removing two (2) disconnect switches and their foundations, removing one (1) 230-kV power circuit breaker and its foundation, removing two (2) single platforms, removing one (1) double platform, installing one (1) bus pole and its foundation, replacing twelve (12) 230-kV disconnecting switches, replacing two (2) 230-kV disconnecting switches with ground blades, installing one (1) 230-kV CCVT and its foundation, installing a prefabricated control building and associated equipment, material and foundations.

    Key dates

    1. May 29, 2025Posted Date
    2. July 25, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Y--YELLOWTAIL SWITCHYARD DCS PHASE I PRE-FABRICATED BUILDING AND CONSTRUCTION is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.