Active Solicitation · DEPT OF DEFENSE

    Yuba Gravel Placement

    Sol. W9123826QA014SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)SACRAMENTO, CA
    Open · 1d remaining
    DAYS TO CLOSE
    1
    closes Jun 4, 2026
    POSTED
    Jun 2, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    F019
    Product & service classification

    AI Summary

    The Yuba Gravel Placement project aims to rehabilitate geomorphic processes and aquatic habitat in the Lower Yuba River by placing suitable spawning gravel. This project is crucial for improving ecological functionality and supporting salmonid spawning in designated critical habitats. A mandatory site walk is scheduled for May 27, 2026, at 10:30 AM PDT.

    Contract details

    Solicitation No.
    W9123826QA014
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 2, 2026
    Response Deadline
    June 4, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    F019
    Contract Code
    2100
    Primary Contact
    Julie Maxwell
    State
    CA
    ZIP Code
    95814-2922
    AI Product/Service
    both

    Description

    ** Update** 06/2/2026 posted sign-in-sheet from May 27 site walk. ********************************************************************************** Please be advised that the mandatory Site Walk is scheduled as follows: Date: 27 May 2026 Time: 10:30AM PDT Location: 12896 Englebright Dam Rd Smartsville, CA 95977 _________________________________________________________________________________________________________The purpose of the Yuba Gravel Placement project is to place suitable-sized spawning gravel within the upper Narrows reach for rehabilitating associated geomorphic processes and aquatic habitat in the Englebright Dam reach of the Lower Yuba River. Implementation of a long-term augmentation program will serve to improve the overall ecological functionality of the channel. The project will provide gravel and cobble suitable for anadromous salmonid adult spawning, embryo incubation, and survival to emergence in a key area in the lower Yuba River designated as critical habitat for the Central Valley spring-run Chinook salmon and the Central Valley steelhead.

    Key dates

    1. June 2, 2026Posted Date
    2. June 4, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Yuba Gravel Placement is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.