This opportunity involves the repair of electrical distribution lines at Ascension Auxiliary Airfield. The contractor will provide labor, equipment, and materials to replace existing overhead lines and poles, including the installation of new electrical equipment and underground duct banks. The project is set to be conducted under a formal solicitation process.
Amendment 4:
The purpose of this amendment is to (1) incorporate the Government's official responses to contractor-submitted questions, as Section J, Attachment 22, (2) add reference documents, specifically the Design Analysis Section J, Attachment 23 and the Geology Study Section J, Attachment 24, as part of the aforementioned Government responses, and (3) revise the bid opening method from a telephonic conference to a virtual meeting conducted via Microsoft Teams. The access details and procedures for the Microsoft Teams meeting are specified in Section L, Paragraph L-6.
Amendment 3:
The purpose of this Amendment is to change the required bid submission date and bid opening date to allow the Government additional time needed for responding to contractor submitted questions. Government responses to contractor questions will be provided in a subsequent amendment.
Amendment 2:
The purpose of this Amendment is to (1) Revise the required bid submission date as reflected in SF1442 Block 13a to 16 December, 2025, at 9:00 AM local time, (2) Update the USTRANSCOM airfare rate listed in Section C, Para 5.2 to reflect the FY26 rate of $3,238 (one-way), (3) Update Section J, Attachment 9, 2025-2026 Ascension Flight Schedule. Government responses to contractor questions will be provided in a subsequent amendment.
Amendment 1:
The purpose of this Amendment is to extend the deadline for offers due from 6 November 2025 to now reflect 8 December 2025. All other terms and conditions remain unchanged.
Construction. Contractor shall provide all labor, equipment, and materials to repair by replacement the existing overhead Feeder 5 with new overhead lines and poles. Project scope includes removal of overhead electrical distribution lines, poles, pole hardware, guy cables/anchors, and electrical equipment. Installation of new overhead open wire and triplex circuit including all poles, pole hardware, guy cables/anchors, and electrical equipment. Terminate and install new primary feeder wires and cable. Install new Load Break Switch, manholes, and underground duct bank near Hogan's Bypass. New underground duct banks and manholes will be installed to allow the new Feeder 5 distribution lines to travel underneath roads without providing a clearance issue for construction vehicles.
Location: Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean.
YXTK 13-1806 REPAIR ELECTRICAL DISTRIBUTION LINES, FEEDER 5, ASCENSION AUXILIARY AIRFIELD (AAAF), SOUTH ATLANTIC OCEAN is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.