Closed Solicitation · DEPARTMENT OF VETERANS AFFAIRS

    Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC

    DEPARTMENT OF VETERANS AFFAIRS
    Sol. 36C26126R0036SolicitationMATHER, CA
    Closed
    STATUS
    Closed
    closed Jul 20, 2026
    POSTED
    Jul 17, 2026
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Z1DA
    Product & service classification

    AI Summary

    The Department of Veterans Affairs is seeking contractors for the renovation of the outpatient pharmacy and HVAC systems. The project includes specific timelines for relocation and completion, with a total performance period of 540 calendar days. Contractors must address various construction-phase requirements and clarifications as outlined in the solicitation amendment.

    Contract details

    Solicitation No.
    36C26126R0036
    Notice Type
    Solicitation
    Posted Date
    July 17, 2026
    Response Deadline
    July 20, 2026
    NAICS Code
    236220AI guide
    PSC / Class Code
    Z1DA
    Contract Code
    3600
    Primary Contact
    Jose A Hernandez
    City
    MATHER
    State
    CA
    ZIP Code
    95655
    AI Product/Service
    both

    Award information

    Awardee
    null
    Award Date

    Description

    AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. CONTINUATION PAGE 2 SOLICITATION NO: 36C26126R0036 ORDER NO: AMENDMENT NO: 0005 14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED) The purpose of this amendment is to answer three additional RFIs. Section 01 00 00 requires the project schedule to include a minimum of forty-five (45) days for VAÂ relocation of Pharmacy Services into the completed temporary facilities, and a minimum of forty-five (45) days for VA relocation of staff, equipment, and operations from the temporary facilities back into Building 650 upon completion of the renovated outpatient pharmacy suite. Please confirm: (a) whether both 45-day VA relocation periods are included within the 540-calendar-day period of performance; and (b) whether contract completion for purposes of the period of performance is measured at Government acceptance of the renovated pharmacy suite, or upon completion of temporary facility removal and complete site restoration following the VA's 45-day relocation back into Building 650. ANSWER: The 540-calendar-day Contract Time includes both 45-calendar-day VA relocation periods. Contract completion is achieved upon completion of all Contract Work, including removal of the temporary facilities and complete site restoration following the VA's final relocation back into Building 650. "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. Section 01 00 00 states: 100% of ALL project submittals shall be approved prior to the construction start date. Please clarify whether construction start date refers to (a) commencement of temporary facility construction, or (b) commencement of renovation work within Building 650. Please also confirm whether closeout-phase submittals (e.g., O&M manuals, as-built drawings) and late-phase finish material submittals are included in this requirement, or whether it applies to construction-phase submittals only. GLBA appreciates the Government's attention to these questions and remains available for any clarification needed. ANSWER: "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. One of our drywall trade partners has brought up a conflict they have found on the existing walls at the perimeter of the pharmacy. Per wall type Mbb3 on Sheet A-501 at the corridor it appears that the framing is existing and one new layer of board, the security mesh fire safing and a closure angle is required to be installed. How we would install the 3 slip track at an existing wall? Are they to be cut between the existing studs and fastened to the bottom of the roof deck? Please advise if the slip track is needed. ANSWER: Install the head-of-wall/slip-track assembly at the existing wall by attaching the slip track to the structure above as required to maintain the specified assembly. Existing studs are not required to be removed or modified except as necessary to complete the installation. ///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////

    Key dates

    1. July 17, 2026Posted Date
    2. July 20, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC is a federal contract award from DEPARTMENT OF VETERANS AFFAIRS. Review the award details including the awardee, contract value, and NAICS code.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.