    AI Summary

    The Department of Veterans Affairs is seeking contractors for the Medical Gas Outlet Replacement project at Vancouver, WA. The work involves replacing medical air, vacuum, and oxygen outlets while ensuring minimal disruption to medical center activities. The project requires certified installers and adherence to safety and fire regulations. Completion is expected within five weeks, with specific phases for patient safety.

    Contract details

    Solicitation No.
    36C26025R0084
    Notice Type
    Sources Sought
    Posted Date
    August 11, 2025
    Response Deadline
    August 22, 2025
    NAICS Code
    236220AI guide
    PSC / Class Code
    Z1DA
    Primary Contact
    Meredith Valentine
    State
    WA
    ZIP Code
    98662
    AI Product/Service
    service

    Description

    Scope of Work/Synopsis Project 648-25-100 Bldg. 11 E-wing Medical Gas Outlet Replacement Vancouver WA The project will include: All work to occur after 8:00 am and finish by 5:00 pm Monday through Sunday. All medical center activities will remain open throughout the duration of the construction. Contractor to ensure that all medical center activities remain unimpeded by construction activities. Contractor to provide ASSE 6010 Certified Installer & 6030 Certified Verifier. Contractor to provide all labor, materials, certifications, equipment and devices to replace existing medical air (MA), medical vacuum (MV), and oxygen (O2) outlets with new. This project will occur in two phases. Patients and VA staff will occupy all other spaces in building 11, E-wing. VA will provide E-wing patients with devices and oxygen tanks throughout the duration of this project. This will allow the contractor to lock out/tag out the E-wing MA, MV and O2 that supplies services to each patient room. This is for safety. The contractor will have 2 weeks to complete phase 1. The VA will inspect the work and when approved will take 1 week to move patients into the phase 1 rooms with their devices and tanks. The contractor will then have 2 weeks to finish phase 2. VA expects the work to be completed within 5 weeks. Work will not start until all submittals are complete and all materials are on hand/site. Contractor shall purge the main/branch lines and certify according to the specifications. Refer to the specifications for all work required for successful completion. Contractor shall ensure that all Class 4 ICRA requirements are met according to the permit. Provide a negative air machine in each patient room per phase. Route the exhaust outside the window. Secure with plywood to prevent unauthorized access into the rooms. Ensure that smoke is exhausted outside of the facility. VA FMS uses Anteroom by hepacart to satisfy the Class 4 ICRA requirements. Contractor shall provide/rent/use something equivalent for this project. VA FMS will not provide these for this project. E-wing has wooden stud framing so contractor must take all precautions to prevent fire hazards. See specifications for additional requirements related to Fire and Life Safety.

    Key dates

    1. August 11, 2025Posted Date
    2. August 22, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Z1DA--CON 648-25-100 BLDG.11 E-WING MEDICAL GAS OUTLET REPLACEMENT is a federal acquisition solicitation issued by DEPARTMENT OF VETERANS AFFAIRS. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.