Closed Solicitation · DEPARTMENT OF TRANSPORTATION
AI Summary
The project involves the installation of a new 18-inch high raised access floor system in the Control Wing Basement at ZDV, including ADA compliant ramps and stairs, a new partition, and door modifications. Contractors must provide all necessary labor, materials, and equipment to complete the work as per the specifications.
The overall scope of this project is to provide a new 18” high raised access floor system (+/- 2,982 SF) and SRG in the
Control Wing Basement at ZDV. (2) new ADA compliant ramps and stairs will be provided to access the new raised access
floor. A new 9’-6” partition will be constructed to enclose the new raised access floor system. The existing nonconforming
east door will be removed, and a new door will be provided within a new 2-hour rated alcove.
The contractor shall provide all necessary labor, materials, and equipment to complete the following work. Also review
the attached drawings and specifications.
ZDV CTRB RAISED FLOOR is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.