Active SLED Opportunity · SOUTH CAROLINA · HORRY COUNTY GOVERNMENT
AI Summary
Horry County Government seeks quotes for comprehensive single-family home rehabilitation at 1017 Mistletoe Court, Myrtle Beach, SC. Scope includes roofing, flooring, painting, HVAC, electrical, and general construction services. Mandatory pre-bid conference on 2026-05-20. Due date for quotes is 2026-06-03.
Single family rehabilitation of 1017 Mistletoe Court, Myrtle Beach. **Project Type**: QR - Quote Request (Informal) **Source ID**: PU.MU.USA.715279.C17940726 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/26/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Community Development **Reference Number**: 0000423203 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Required Forms Packet | Required forms | Yes | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 05/20/2026 10:00 AM EDT | Location: 1017 Mistletoe Court, Myrtle Beach, SC 29579 | Event Note: Non-attendees are not permitted to bid. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next HOME-1017 Mistletoe Ct Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Next HOME-1017 Mistletoe Ct Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Code Description UOM Qty | Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | General Conditions-75 | Materials to provide for permit | Unit | 1 | | | | Next HOME-1017 Mistletoe Ct Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Code Description UOM Qty | Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | General Conditions-75 | Materials to provide for permit | Unit | 1 | | | Code Description UOM Qty | | Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | General Conditions-75 | Materials to provide for permit | Unit | 1 | | | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | | General Conditions-75 | Materials to provide for permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next HOME-1017 Mistletoe Ct Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Code Description UOM Qty | Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | General Conditions-75 | Materials to provide for permit | Unit | 1 | | | Code Description UOM Qty | | Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | General Conditions-75 | Materials to provide for permit | Unit | 1 | | | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | | General Conditions-75 | Materials to provide for permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | Roofing-02 Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Roofing-03 Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum Square 17 Fascia/Soffit/Columns-04 Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-05 Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. Linear Foot/Feet 19 Fascia/Soffit/Columns-06 Materials to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-07 Labor to install aluminum trim coil on three (3) columns located on front porch Unit 3 Fascia/Soffit/Columns-08 Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Fascia/Soffit/Columns-09 Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit Unit 1 Doors-10 Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-11 Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. Unit 1 Doors-12 Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Doors-13 Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. Unit 1 Living Room & Hallway-14 Materials to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-15 Labor to remove and dispose of floor covering Square Foot/Feet 280 Living Room & Hallway-16 Materials to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-17 Labor to install vinyl plank flooring Square Foot/Feet 280 Living Room & Hallway-18 Materials to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-19 Labor to install 3/4" round trim Linear Foot/Feet 96 Living Room & Hallway-20 Materials to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-21 Labor to prep and paint walls & baseboard Square Foot/Feet 768 Living Room & Hallway-22 Materials to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-23 Labor to install pull down attic stairs. Include casing. Unit 1 Living Room & Hallway-24 Materials to install a flush mount 13" LED ceiling fixture Unit 1 Living Room & Hallway-25 Labor to install a flush mount 13" LED ceiling fixture Unit 1 Kitchen-26 Materials to prep and paint walls and base board Square Foot/Feet 496 Kitchen-27 Labor to prep and paint walls and base board Square Foot/Feet 496 Kitchen-28 Materials to install over-the-range exhaust hood Unit 1 Kitchen-29 Labor to install over-the-range exhaust hood Unit 1 Kitchen-30 Materials to install single lever faucet with side sprayer Unit 1 Kitchen-31 Labor to install single lever faucet with side sprayer Unit 1 Kitchen-32 Materials to replace three (3) GFI's with cover plates Unit 3 Kitchen-33 Labor to replace three (3) GFI's with cover plates Unit 3 Kitchen-34 Materials to replace two (2) outlets with cover plates Unit 2 Kitchen-35 Labor to replace two (2) outlets with cover plates Unit 2 Kitchen-36 Materials to replace one (1) three-switch cover plate Unit 1 Kitchen-37 Labor to replace one (1) three-switch cover plate Unit 1 Kitchen-38 Materials to replace one (1) one-switch cover plate Unit 1 Kitchen-39 Labor to replace one (1) one-switch cover plate Unit 1 Master Bedroom-40 Materials to patch crack in floor slab Unit 1 Master Bedroom-41 Labor to patch crack in floor slab Unit 1 Master Bedroom-42 Materials to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-43 Labor to install vinyl plank flooring Square Foot/Feet 190 Master Bedroom-44 Materials to install 3/4" round trim Linear Foot/Feet 58 Master Bedroom-45 Labor to install 3/4" round trim Linear Foot/Feet 58 Master Bath-46 Materials to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Master Bath-47 Labor to install five (5) bulb vanity light. Include bulbs with light fixture. Unit 1 Bedroom #2-48 Materials to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-49 Labor to remove and dispose of floor covering Square Foot/Feet 117 Bedroom #2-50 Materials to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-51 Labor to install vinyl plank flooring Square Foot/Feet 117 Bedroom #2-52 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #2-53 Labor to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-54 Materials to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-55 Labor to remove and dispose of floor covering Square Foot/Feet 120 Bedroom #3-56 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-57 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom #3-58 Materials to install 3/4" round trim Linear Foot/Feet 44 Bedroom #3-59 Labor to install 3/4" round trim Linear Foot/Feet 44 Hall Bathroom-60 Materials to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-61 Labor to install a four (4) bulb vanity light, to include bulbs with fixture. Unit 1 Hall Bathroom-62 Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Hall Bathroom-63 Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. Unit 1 Heating & Air-64 Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-65 Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. Unit 1 Heating & Air-66 Materials to install new copper line set with cover Unit 1 Heating & Air-67 Labor to install new copper line set with cover Unit 1 Heating & Air-68 Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-69 Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat Unit 1 Heating & Air-70 Materials to install new ceiling registers Unit 8 Heating & Air-71 Labor to install new ceiling registers Unit 8 General Conditions-72 Materials to provide Storage Pod / Container Unit 1 General Conditions-73 Materials to provide for trash removal Unit 1 General Conditions-74 Materials to provide for Porta-john Unit 1 General Conditions-75 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | General Conditions-75 | Materials to provide for permit | Unit | 1 | | | Roofing-02 | Materials to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | | Roofing-03 | Labor to remove existing shingles and felt underlayment, install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots. Use architectural shingles rated for 110 mph wind minimum | Square | 17 | | Fascia/Soffit/Columns-04 | Materials to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | | Fascia/Soffit/Columns-05 | Labor to install aluminum trim coil on the fascia and vinyl soffit on the right side of the home. | Linear Foot/Feet | 19 | | Fascia/Soffit/Columns-06 | Materials to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | | Fascia/Soffit/Columns-07 | Labor to install aluminum trim coil on three (3) columns located on front porch | Unit | 3 | | Fascia/Soffit/Columns-08 | Materials to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | | Fascia/Soffit/Columns-09 | Labor to pressure wash exterior, remove all mold and algae to include all siding, fascia, and soffit | Unit | 1 | | Doors-10 | Materials to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | | Doors-11 | Labor to install a 6-panel pre-hung metal clad door at front entry. Include matching lockset and interior casing. | Unit | 1 | | Doors-12 | Materials to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | | Doors-13 | Labor to install a pre-hung 6-panel metal clad door at the exterior utility room. Include interior casing and lockset. | Unit | 1 | | Living Room & Hallway-14 | Materials to remove and dispose of floor covering | Square Foot/Feet | 280 | | Living Room & Hallway-15 | Labor to remove and dispose of floor covering | Square Foot/Feet | 280 | | Living Room & Hallway-16 | Materials to install vinyl plank flooring | Square Foot/Feet | 280 | | Living Room & Hallway-17 | Labor to install vinyl plank flooring | Square Foot/Feet | 280 | | Living Room & Hallway-18 | Materials to install 3/4" round trim | Linear Foot/Feet | 96 | | Living Room & Hallway-19 | Labor to install 3/4" round trim | Linear Foot/Feet | 96 | | Living Room & Hallway-20 | Materials to prep and paint walls & baseboard | Square Foot/Feet | 768 | | Living Room & Hallway-21 | Labor to prep and paint walls & baseboard | Square Foot/Feet | 768 | | Living Room & Hallway-22 | Materials to install pull down attic stairs. Include casing. | Unit | 1 | | Living Room & Hallway-23 | Labor to install pull down attic stairs. Include casing. | Unit | 1 | | Living Room & Hallway-24 | Materials to install a flush mount 13" LED ceiling fixture | Unit | 1 | | Living Room & Hallway-25 | Labor to install a flush mount 13" LED ceiling fixture | Unit | 1 | | Kitchen-26 | Materials to prep and paint walls and base board | Square Foot/Feet | 496 | | Kitchen-27 | Labor to prep and paint walls and base board | Square Foot/Feet | 496 | | Kitchen-28 | Materials to install over-the-range exhaust hood | Unit | 1 | | Kitchen-29 | Labor to install over-the-range exhaust hood | Unit | 1 | | Kitchen-30 | Materials to install single lever faucet with side sprayer | Unit | 1 | | Kitchen-31 | Labor to install single lever faucet with side sprayer | Unit | 1 | | Kitchen-32 | Materials to replace three (3) GFI's with cover plates | Unit | 3 | | Kitchen-33 | Labor to replace three (3) GFI's with cover plates | Unit | 3 | | Kitchen-34 | Materials to replace two (2) outlets with cover plates | Unit | 2 | | Kitchen-35 | Labor to replace two (2) outlets with cover plates | Unit | 2 | | Kitchen-36 | Materials to replace one (1) three-switch cover plate | Unit | 1 | | Kitchen-37 | Labor to replace one (1) three-switch cover plate | Unit | 1 | | Kitchen-38 | Materials to replace one (1) one-switch cover plate | Unit | 1 | | Kitchen-39 | Labor to replace one (1) one-switch cover plate | Unit | 1 | | Master Bedroom-40 | Materials to patch crack in floor slab | Unit | 1 | | Master Bedroom-41 | Labor to patch crack in floor slab | Unit | 1 | | Master Bedroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 190 | | Master Bedroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 190 | | Master Bedroom-44 | Materials to install 3/4" round trim | Linear Foot/Feet | 58 | | Master Bedroom-45 | Labor to install 3/4" round trim | Linear Foot/Feet | 58 | | Master Bath-46 | Materials to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | | Master Bath-47 | Labor to install five (5) bulb vanity light. Include bulbs with light fixture. | Unit | 1 | | Bedroom #2-48 | Materials to remove and dispose of floor covering | Square Foot/Feet | 117 | | Bedroom #2-49 | Labor to remove and dispose of floor covering | Square Foot/Feet | 117 | | Bedroom #2-50 | Materials to install vinyl plank flooring | Square Foot/Feet | 117 | | Bedroom #2-51 | Labor to install vinyl plank flooring | Square Foot/Feet | 117 | | Bedroom #2-52 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #2-53 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #3-54 | Materials to remove and dispose of floor covering | Square Foot/Feet | 120 | | Bedroom #3-55 | Labor to remove and dispose of floor covering | Square Foot/Feet | 120 | | Bedroom #3-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom #3-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom #3-58 | Materials to install 3/4" round trim | Linear Foot/Feet | 44 | | Bedroom #3-59 | Labor to install 3/4" round trim | Linear Foot/Feet | 44 | | Hall Bathroom-60 | Materials to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | | Hall Bathroom-61 | Labor to install a four (4) bulb vanity light, to include bulbs with fixture. | Unit | 1 | | Hall Bathroom-62 | Materials to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | | Hall Bathroom-63 | Labor to install a 50 cfm bath exhaust fan with light. Connect to existing duct and wiring. | Unit | 1 | | Heating & Air-64 | Materials to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | | Heating & Air-65 | Labor to install a 2-ton split HVAC system, to connect to existing duct. Per Code. | Unit | 1 | | Heating & Air-66 | Materials to install new copper line set with cover | Unit | 1 | | Heating & Air-67 | Labor to install new copper line set with cover | Unit | 1 | | Heating & Air-68 | Materials to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | | Heating & Air-69 | Labor to install electrical for HVAC system, to include breakers, disconnect, and thermostat | Unit | 1 | | Heating & Air-70 | Materials to install new ceiling registers | Unit | 8 | | Heating & Air-71 | Labor to install new ceiling registers | Unit | 8 | | General Conditions-72 | Materials to provide Storage Pod / Container | Unit | 1 | | General Conditions-73 | Materials to provide for trash removal | Unit | 1 | | General Conditions-74 | Materials to provide for Porta-john | Unit | 1 | | General Conditions-75 | Materials to provide for permit | Unit | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.