Active SLED Opportunity · FLORIDA · CITY OF RIVIERA BEACH
AI Summary
Invitation to bid for reconstruction of public streets in Riviera Beach, FL, including pavement, sidewalks, drainage, water and sewer system replacement, and traffic devices. Electronic bid submission due July 24, 2026.
reconstruct of deteriorated public streets, installation of limerock base, asphaltic pavement, concrete sidewalks, concrete curb and gutter, reinforced concrete drainage pipe and inlet structures, ex-filtration trench, replacement of existing water main, and services, installation of fire hydrants and appurtenances, replacement of existing sanitary sewer system, manholes and lines including lateral services and cleanouts, traffic calming devices, striping and signage, and grouting, adjustment, and proper disposal or abandonment of existing utilities. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PV.AG.USA.2838913.C19816476 **Piggyback Contract**: No **Question Acceptance Deadline**: 07/07/2026 05:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: Payment & Performance bonds shall be 110% not 100%. **Reference Number**: 0000426396 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Authorized Signatories Form - REQUIRED | Authorized Signatories Form | Yes | Yes | | Conflict of Interest Disclosure Form - REQUIRED | Conflict of Interest Disclosure Form | Yes | Yes | | General Certs. One Page Signature - REQUIRED | General Certs. One Page Signature | Yes | Yes | | Human Trafficking Affidavit - NOTORIZED - REQUIRED | Human Trafficking Affidavit - NOTORIZED - REQUIRED | Yes | Yes | | Litigation Statement - REQUIRED | Litigation Statement - REQUIRED | Yes | Yes | | Public Entity Crime Statement NOTORIZED - REQUIRED | Public Entity Crime Statement NOTORIZED - REQUIRED | Yes | Yes | | References - REQUIRED | References - REQUIRED | Yes | Yes | | ATTACHMENT C Bid Cost Proposal | ATTACHMENT C Bid Cost Proposal | Yes | Yes | | SBE Schedule 1 | SBE Schedule 1 | No | No | | SBE Schedule 2 | SBE Schedule 2 | No | No | | Local Vendor Preference Program | Local Vendor Preference Program | No | No | | Bid Bond Form | Bid Bond Form | Yes | Yes | | Payment Bond Acknowledgement Form | Payment Bond Acknowledgement Form | Yes | Yes | | Performance Bond Acknowledgement Form | Performance Bond Acknowledgement Form | Yes | Yes | | Business License (myfloridalicense.com) | Business License (myfloridalicense.com) | Yes | Yes | | Certificate of Good Standing (Sunbiz) | Certificate of Good Standing (Sunbiz) | Yes | Yes | | General Contractors License (myfloridalicense.com) | General Contractors License (myfloridalicense.com) | Yes | Yes | **Questions and Answers**: | Question | Answer | |---|---| | Is there a pre-bid for this solicitation? | Answered in Addendum 3 | | We reviewed the bid specifications and noted that the City has established a 15% SBE participation goal and requires contractors to demonstrate and document a good faith effort toward achieving that goal. We also understand that Schedule 1 and Schedule 2 are required to be submitted with the bid. Could you please confirm whether Good Faith Effort (GFE) documentation is required to be submitted with the bid, or if it is only required post-bid and/or upon request by the City? Thank you for your clarification. | Answered in Addendum 3 | | Will a underground utility & Excavation License and/or FDOT Prequalification be accepted in Lieu of the General Contractors License? | Answered in Addendum 3 | | I can't locate the details for the Speed Humps. I just wanted to verify Speed Hump type and Dimensions. Thank you | Answered in Addendum 5 | | Are there any existing Asbestos pipes within the work area of this project | Answered in Addendum 5 | | Are there any known existing contamination within the vicinity of the work on this project? | Answered in Addendum 5 | | What is the anticipated award date for this project? | Answered in Addendum 3 | | What is the anticipated start date for construction? | Answered in Addendum 5 | | Is there any known construction with other contractors within this project that may impact the work on this contract? If so: a. Where is the work involved? b. What type of work is it? c. What are the dates anticipated? | Answered in Addendum 5 | | Is there any tree removal required in this project? | Answered in Addendum 5 | | Is there any Owner or Utility companies work planned in the project boundaries. | Answered in Addendum 5 | | WHat is the procedure and fees if any for obtaining water for testing and construction use? | Answered in Addendum 5 | | Will you be providing payment for stored materials? | Answered in Addendum 5 | | Are there any materials to be furnished by the City? | Answered in Addendum 5 | | Any vibration Monitoring requirements in specs? | Answered in Addendum 5 | | Unmarked utilities, marked after NTP/Construction. Since the quantity of utilities not shown on plans and marked after the bid cannot be calculated. How will the Owner recompensate the Contractor for the additional exploration of such utilities? We suggest creating a unit pay item for such an occurrence | Answered in Addendum 5 | | Are there any schools within the within or impacting this project? | Answered in Addendum 5 | | will the uploaded Bid bond be sufficed? Or does the city require the original is submitted? If original is required, do we submit prior to bid opening or within a certain amount days after the bid opening? | Answered in Addendum 3 | | Clarify contract days. Some places states 180/210 others state 150/180 | Answered in Addendum 5 | | BID ITEM # 52 DRAINAGE OUTFALL STRUCTURE – Will the property owner move the shed in he rear yard? Is the restoration of the property incidental to the Outfall construction? Will the utility light pole on Ave O, in the Right of Way, adjacent to the existing drain structure be removed by others? | Answered in Addendum 5 | | BID ITEM A1-1 REMOVE AND DISPOSE EXISTING SANITARY SEWER PIPE – Does this item include the sanitary service pipe? Also, what restoration is to be included in this item? | Answered in Addendum 5 | | provide the SBE list or sbe web page we are to use to meet to 15% goal on this contract. | Answered in Addendum 3 | | Please provide soil borings. | Answered in Addendum 5 | | attachement k specs PDF page13 States: “No separate or direct payment will be made to the Contractor for permits and inspection requirements, but all such costs shall be included in the bid proposal. The Owner will furnish signed and sealed sets of Contract Documents for permit use as required.” City is not providing the typical allowance pay item to reimburse permit fees and charges, per the Florida Permit Fee Transparency Law, please provide all Contacts and permit(s) fee cost(s) for this project and identify the contact(s) data, price(s) and fees of any other municipality or agencies requiring permits for this project, so that such costs can be included in this bid. | Answered in Addendum 5 | | What are the working hours allowed? Typically, they are from 6am thru 6pm Monday thru Friday. | Answered in Addendum 5 | | regarding spec section 01540 SECURITY. Please provide specific details of the Locations required Where Entry controls A through D is applicable. | Answered in Addendum 5 | | spec section 01540 "guard service" states “When required, employ guard service to provide watchmen at site during all non working hours, seven days a week. Please clarify locations, when, and for how long each location? | Answered in Addendum 5 | | specs section 02211 PDF page -116, States: “ROCK AND BOULDER EXCAVATION. Section includes the excavation, disposal and replacement of rock and boulders…” In order to include such costs, please provide the locations and depth of where the rock and boulder are known | Answered in Addendum 5 | | spec section 02931 PDF page-193… Sod shall be replaced in-kind with the type of sod existing prior to the work..” Since there is an extreme cost between Floratam and Bahia, rather than pricing all at Bahia price to be safe, please provide separate prices for Bahia and for Floratam. | Answered in Addendum 5 | | plans PDF page 3, drainge note #9, States: “ THE EXFILTRATION TRENCH FIELD SHALL BE DECREASED AT CROSSINGS WITH EXISTING UTILITIES TO REMAIN TO MAINTIAN A 1' CLEARANCE.” Please clarify with a detail and specific particulars on this item. | Answered in Addendum 5 | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/15/2026 03:59 PM EDT | | | Addendum No. 2 | 07/16/2026 03:28 PM EDT | | | Addendum No. 3 | 07/21/2026 04:31 PM EDT | | | Addendum No. 4 | 07/24/2026 03:48 PM EDT | | | Addendum No. 5 | 07/31/2026 10:26 AM EDT | | | Addendum No. 6 | 08/04/2026 09:02 PM EDT | |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.