    City of Enid seeks bids for construction of a new waterline along Hoover Street, including pipe installation, fire hydrant assembly, concrete repairs, and related infrastructure work. Pre-bid conference on April 8, 2026. Bid due April 24, 2026.

    Opportunity details

    Solicitation No.
    8599011354
    Type / RFx
    ITB
    Status
    Active
    Level
    city
    Published Date
    March 27, 2026
    Due Date
    April 24, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    City of Enid
    Agency
    City of Enid

    Description

    This project provides for the construction of a new waterline along Hoover Street between West Maine to West Cherokee Avenue. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1158120.C16639226 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/10/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic or Physical Bid Submission **Owner Organization**: City of Enid **Reference Number**: 0000417992 **Pricing**: Item Based **Bid Documents List**: | Question Name | Question Description | Mandatory | |---|---|---| | Calendar Days | Please enter in your calendar days. | Yes | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/08/2026 11:00 AM EDT | Location: Conference Room B & via Zoom | Event Note: Topic: Pre-Bid: 200-300 Blk Hoover Street Waterline Relocation Time: Apr 8, 2026 10:00 AM Central Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/87148053684?pwd=8k2c89i1tHfUlEO597IybbQjPwVnT4.1 Meeting ID: 871 4805 3684 Passcode: 078024 **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | | Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking/As-Built | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | | 17 | Ductile Iron Fittings | Pound | 2198 | | 18 | PVC to HDPE Transition Connection | Each | 2 | | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | | 20 | Single Short Service (1") Installation | Each | 10 | | 21 | Single Long Service (1") Installation | Each | 9 | | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | | 23 | Tie into Existing Waterline | Each | 5 | | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | | 25 | Fire Hydrant Removal | Each | 1 | | 26 | Concrete Street, Complete in Place | Square Yard | 94 | | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | | 29 | Solid Slab Sodding | Square Yard | 124 | | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking/As-Built | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | | 17 | Ductile Iron Fittings | Pound | 2198 | | 18 | PVC to HDPE Transition Connection | Each | 2 | | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | | 20 | Single Short Service (1") Installation | Each | 10 | | 21 | Single Long Service (1") Installation | Each | 9 | | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | | 23 | Tie into Existing Waterline | Each | 5 | | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | | 25 | Fire Hydrant Removal | Each | 1 | | 26 | Concrete Street, Complete in Place | Square Yard | 94 | | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | | 29 | Solid Slab Sodding | Square Yard | 124 | | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking/As-Built | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | | 17 | Ductile Iron Fittings | Pound | 2198 | | 18 | PVC to HDPE Transition Connection | Each | 2 | | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | | 20 | Single Short Service (1") Installation | Each | 10 | | 21 | Single Long Service (1") Installation | Each | 9 | | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | | 23 | Tie into Existing Waterline | Each | 5 | | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | | 25 | Fire Hydrant Removal | Each | 1 | | 26 | Concrete Street, Complete in Place | Square Yard | 94 | | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | | 29 | Solid Slab Sodding | Square Yard | 124 | | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 |

    Key dates

    1. March 27, 2026Published
    2. April 24, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.