SLED Opportunity · OKLAHOMA · CITY OF ENID
AI Summary
City of Enid seeks bids for construction of a new waterline along Hoover Street, including pipe installation, fire hydrant assembly, concrete repairs, and related infrastructure work. Pre-bid conference on April 8, 2026. Bid due April 24, 2026.
This project provides for the construction of a new waterline along Hoover Street between West Maine to West Cherokee Avenue. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1158120.C16639226 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/10/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic or Physical Bid Submission **Owner Organization**: City of Enid **Reference Number**: 0000417992 **Pricing**: Item Based **Bid Documents List**: | Question Name | Question Description | Mandatory | |---|---|---| | Calendar Days | Please enter in your calendar days. | Yes | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/08/2026 11:00 AM EDT | Location: Conference Room B & via Zoom | Event Note: Topic: Pre-Bid: 200-300 Blk Hoover Street Waterline Relocation Time: Apr 8, 2026 10:00 AM Central Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/87148053684?pwd=8k2c89i1tHfUlEO597IybbQjPwVnT4.1 Meeting ID: 871 4805 3684 Passcode: 078024 **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | | Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking/As-Built | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | | 17 | Ductile Iron Fittings | Pound | 2198 | | 18 | PVC to HDPE Transition Connection | Each | 2 | | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | | 20 | Single Short Service (1") Installation | Each | 10 | | 21 | Single Long Service (1") Installation | Each | 9 | | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | | 23 | Tie into Existing Waterline | Each | 5 | | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | | 25 | Fire Hydrant Removal | Each | 1 | | 26 | Concrete Street, Complete in Place | Square Yard | 94 | | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | | 29 | Solid Slab Sodding | Square Yard | 124 | | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next W-2601C-Base Bid - Phase 1 Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking/As-Built | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | | 17 | Ductile Iron Fittings | Pound | 2198 | | 18 | PVC to HDPE Transition Connection | Each | 2 | | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | | 20 | Single Short Service (1") Installation | Each | 10 | | 21 | Single Long Service (1") Installation | Each | 9 | | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | | 23 | Tie into Existing Waterline | Each | 5 | | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | | 25 | Fire Hydrant Removal | Each | 1 | | 26 | Concrete Street, Complete in Place | Square Yard | 94 | | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | | 29 | Solid Slab Sodding | Square Yard | 124 | | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking/As-Built Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 Construction Sign, Complete in Place (See Detail WL-306) Each 1 6 12" HDPE DIPS DR 9, Materials Linear Foot/Feet 40 7 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) Linear Foot/Feet 40 8 12" PVC C900 DR 18, Materials Linear Foot/Feet 10 9 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 10 10 8" PVC C900 DR 18, Interlocking, Materials Linear Foot/Feet 20 11 8" PVC C900 DR 18, Installation by Boring (Complete in Place) Linear Foot/Feet 20 12 8" PVC C900 DR 18, Materials Linear Foot/Feet 495 13 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 495 14 6" PVC C900 DR 18, Materials Linear Foot/Feet 1 15 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) Linear Foot/Feet 1 16 Fire Hydrant Assembly with Valve, Complete in Place Each 1 17 Ductile Iron Fittings Pound 2198 18 PVC to HDPE Transition Connection Each 2 19 Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) Cubic Yard 94 20 Single Short Service (1") Installation Each 10 21 Single Long Service (1") Installation Each 9 22 8" Gate Valve & Box Complete in Place Each 3 23 Tie into Existing Waterline Each 5 24 Pressure Testing and Disinfection Complete in Place Lump-Sum 1 25 Fire Hydrant Removal Each 1 26 Concrete Street, Complete in Place Square Yard 94 27 Concrete Driveway Repair, Complete in Place Square Yard 79 28 Concrete Sidewalk Repair, Complete in place Square Yard 6 29 Solid Slab Sodding Square Yard 124 30 *Additional Concrete Repair, Complete in Place Square Yard 20 31 *Additional length of customer service line, Complete in Place Linear Foot/Feet 10 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking/As-Built | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | 17 | Ductile Iron Fittings | Pound | 2198 | 18 | PVC to HDPE Transition Connection | Each | 2 | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | 20 | Single Short Service (1") Installation | Each | 10 | 21 | Single Long Service (1") Installation | Each | 9 | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | 23 | Tie into Existing Waterline | Each | 5 | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | 25 | Fire Hydrant Removal | Each | 1 | 26 | Concrete Street, Complete in Place | Square Yard | 94 | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | 29 | Solid Slab Sodding | Square Yard | 124 | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking/As-Built | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | Construction Sign, Complete in Place (See Detail WL-306) | Each | 1 | | 6 | 12" HDPE DIPS DR 9, Materials | Linear Foot/Feet | 40 | | 7 | 12" HDPE DIPS DR 9, Installation by Bored (Complete in Place) | Linear Foot/Feet | 40 | | 8 | 12" PVC C900 DR 18, Materials | Linear Foot/Feet | 10 | | 9 | 12" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 10 | | 10 | 8" PVC C900 DR 18, Interlocking, Materials | Linear Foot/Feet | 20 | | 11 | 8" PVC C900 DR 18, Installation by Boring (Complete in Place) | Linear Foot/Feet | 20 | | 12 | 8" PVC C900 DR 18, Materials | Linear Foot/Feet | 495 | | 13 | 8" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 495 | | 14 | 6" PVC C900 DR 18, Materials | Linear Foot/Feet | 1 | | 15 | 6" PVC C900 DR 18, Installation by Trench & Fill (Complete in Place) | Linear Foot/Feet | 1 | | 16 | Fire Hydrant Assembly with Valve, Complete in Place | Each | 1 | | 17 | Ductile Iron Fittings | Pound | 2198 | | 18 | PVC to HDPE Transition Connection | Each | 2 | | 19 | Type A Aggregate Backfill Under Pavement (0.85 ton/yd3) | Cubic Yard | 94 | | 20 | Single Short Service (1") Installation | Each | 10 | | 21 | Single Long Service (1") Installation | Each | 9 | | 22 | 8" Gate Valve & Box Complete in Place | Each | 3 | | 23 | Tie into Existing Waterline | Each | 5 | | 24 | Pressure Testing and Disinfection Complete in Place | Lump-Sum | 1 | | 25 | Fire Hydrant Removal | Each | 1 | | 26 | Concrete Street, Complete in Place | Square Yard | 94 | | 27 | Concrete Driveway Repair, Complete in Place | Square Yard | 79 | | 28 | Concrete Sidewalk Repair, Complete in place | Square Yard | 6 | | 29 | Solid Slab Sodding | Square Yard | 124 | | 30 | *Additional Concrete Repair, Complete in Place | Square Yard | 20 | | 31 | *Additional length of customer service line, Complete in Place | Linear Foot/Feet | 10 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.