SLED Opportunity · GEORGIA · GEORGIA
AI Summary
Sealed bids are requested for the 2024 Guyton CDBG construction project involving drainage improvements, storm pipe installation, curb and gutter work, pavement replacement, and roadway overlay. Bids due by August 19, 2026, with a 150-day completion timeline.
Sealed bids for construction of 2024 Guyton CDBG will be received until August 19th, 2026, 2 PM at the City of Guyton City Hall at which time and place they will be publicly opened & read. No bid may be withdrawn after the closing time for the receipt of bids for a period of 60 days. The work shall consist of furnishing all products & equipment and performing all labor necessary to perform the following: Drainage improvements including, but not limited to, installation of 18" roll-over curb and gutter, 192-LF of 30" storm pipe, 800-LF of 24" storm pipe, 1080-LF of 18" storm pipe, 15" storm pipe, headwalls, wingwalls and apron. The project will also consist of grate inlets, curb inlets, yard inlets, pavement replacement, & roadway pavement overlay. Time allotted for completion of work is one hundred fifty (150) calendar days. Plans, Specifications, and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set. The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must also employ a "Utility Manager" certification holder who will have oversight of all the work. See Instruction to Bidders for additional bidding requirements. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. Funding is to be provided by the City and CDBG. This project is a Section 3 covered contract. Section 3 Business Concerns are encouraged to apply. This project shall abide by the BABAA. Contractor shall comply with E-Verify regulations. Owner reserves the right to reject any or all Bids and to waive informalities.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.