SLED Opportunity · TENNESSEE · MONTGOMERY COUNTY, TN

    2026-0105 - BID - LONE OAK COMMUNITY CENTER RENOVATIONS

    Issued by Montgomery County, TN
    countyRFQMontgomery County, TNSol. 220082
    Closed
    STATUS
    Closed
    due Feb 25, 2026
    PUBLISHED
    Invalid Date
    Posting date
    JURISDICTION
    Montgomery County,
    county
    NAICS CODE
    236118
    AI-classified industry

    AI Summary

    Montgomery County, TN seeks bids for renovation of the Lone Oak Community Center main floor, including construction, lighting, window replacement, kitchen conversion, flooring, and repainting. Contractors must review full drawings to include all work in their bids.

    Opportunity details

    Solicitation No.
    220082
    Type / RFx
    RFQ
    Status
    Open
    Level
    county
    Published Date
    Invalid Date
    Due Date
    February 25, 2026
    NAICS Code
    236118AI guide
    Agency
    Montgomery County, TN

    Description

    The Scope of Work for this project includes: Renovation/Construction of the Lone Oak Community Center BASE BID encompasses the main floor only. Exterior lights at the main entrance and entry/exit side doors as well as replacing the main entry doors with half-glass, insulated, hollow metal doors and a new door frame with hardware and a removable center mullion. The locks will match the County’s current standard. The existing stained-glass windows will be removed and packaged to return to the building’s previous owner and new double-hung, insulated, vinyl windows will be installed. Walls that have already had some demolition take place will need to be repaired with like construction and new gyp board to match existing. Other areas will have selective demolition taking place and those areas will need to be cleaned and prepped for the new construction that will take place. Review drawings for extents of these locations and work to be done. Existing lights will be removed and replaced with new LED fixtures, some existing fluorescent lights will be converted over to LED fixtures and reinstalled. New faux wood beams will be installed in the main hall with no demolition taking place to install them. Light switches for the main hall will be condensed down to three main switches with each one controlling a different set of lights with on/off function only. No dimmable functions. Two existing rooms will be converted into a warming kitchen with a single stove/oven, two residential style refrigerators, an ice machine, two stainless-steel stand-alone tables and a countertop that almost surrounds the room. No base or overhead cabinets. An exhaust hood with internal Ansul system will be installed over the stove. See mechanical drawings for more information. New plumbing and electrical outlets will also be installed. See plumbing and electrical drawings for more information. New flooring will be installed throughout the entire level; it will also be completely repainted. Verify the area designated to be a one-hour-rated corridor currently meets all requirements. If not, then it will need to be brought up to that level. This does not encompass the entire scope of work to be done so the contractor will need to review the drawings and make certain that all portions of the project are included in their bid.

    Key dates

    1. Invalid DatePublished
    2. February 25, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.