SLED Opportunity · OHIO · CITY OF PERRYSBURG
AI Summary
City of Perrysburg seeks contractors for the 2026 Annual Resurfacing Program involving milling, resurfacing, curb replacement, and related work on multiple streets. Compliance with ODOT and city specifications is required. Project completion by October 31, 2026, with an estimated budget of $1.6 million.
PROJECT DESCRIPTION This project consists of milling and resurfacing, curb replacement and other associated work of Sutton Place, Holbrook Court, Stone Creek Court, Seneca Creek Court, Indian Creek Drive, Little Creek Drive, Pauly Drive, Heilman Drive, Nora Drive-Iron Trail, Southpoint Road, Woodstream Road and Carronade Drive Multiuse Path. The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Perrysburg Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Perrysburg Engineering Department, 127 West Fifth Street, Perrysburg, OH 43551. State prevailing wages shall apply. All work is located within the City of Perrysburg corporation limits and is thereby eligible for City Income Tax collection. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion: on or before October 31, 2026 Engineering Estimate: $ 1,600,000.00
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.