SLED Opportunity · TEXAS · 2026 CONCRETE PAVEMENT STREET AND SIDEWALK REPAIR IN THE LANTANA PROJECT

    2026 Concrete Pavement Street and Sidewalk Repair in the Lantana Project

    Issued by 2026 Concrete Pavement Street and Sidewalk Repair in the Lantana Project
    localRFP2026 Concrete Pavement Street and Sidewalk Repair in the Lantana ProjectSol. 69c58bed6e11cf4f4de0f94a
    Closed
    STATUS
    Closed
    due Apr 10, 2026
    PUBLISHED
    Mar 30, 2026
    Posting date
    JURISDICTION
    2026 Concrete
    local
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    This opportunity is for concrete pavement street and sidewalk repair services in the Lantana community, Denton County, TX. It involves concrete street, curb, and sidewalk repairs with associated work, including traffic control, material testing, and construction staking. The project runs from May to August 2026.

    Opportunity details

    Solicitation No.
    69c58bed6e11cf4f4de0f94a
    Type / RFx
    RFP
    Status
    Active
    Level
    local
    Published Date
    March 30, 2026
    Due Date
    April 10, 2026
    NAICS Code
    237310AI guide
    State
    Texas
    Agency
    2026 Concrete Pavement Street and Sidewalk Repair in the Lantana Project

    Description

    The work for the construction consists of approximately 42,018 SF of concrete street and curb repairs and improvements, along with 1,328 SF of sidewalk repairs and associated work within the Lantana master-planned community in south Denton County, TX. 

    ## Details **Bid/Project ID:** R306792.23 **Type of Work:** Pavement Repairs **Bid Location:** CIVCAST **Bid Notes:** Bid opening & tabulation will be done through CIVCAST **Engineer/Publisher:** Huitt-Zollars Inc. **Engineer Address:** 5430 LBJ Fwy, Ste 1500, Dallas, Texas, 75240 ## Notes • Project construction to start on 5/25/2026 and end on 8/12/2026. All repair work must be completed during this time frame. • Work to be performed while Denton ISD is out for summer break. • Contractor responsible for traffic control plan and implementation/maintenance. • Contractor responsible for re-establishment of pavement markings, buttons and signage. • Construction staking by contractor but Engineer will provide control. • Contractor to specify third party independent construction material testing contractor/lab to be used. • All construction material testing to be provided by Contractor. • All main lane parallel longitudinal butt joints to be doweled and provided with a key-way. • Water meter deposit necessary ($1,000) and water usage must be logged and reported. Project water use will be no charge. • Concrete repairs to restore positive drainage where needed. • All sidewalks to have a 1” fall between the sidewalk and back of curb where a driveway is not present. • Contractor to protect mailboxes during all points of construction. • Contractor to contact homeowners 3 business days prior to eliminating access to their driveway • For limits of pavement replacement, existing subgrade densities to be checked and, if suitable and stable, re-used without re-work. If failures or voids observed existing material to be removed and replaced with compacted/rolled flexbase to meet line, grade and density. • Contractor shall be responsible for SWPPP.

    Key dates

    1. March 30, 2026Published
    2. April 10, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.