Active SLED Opportunity · COLORADO · CITY AND COUNTY OF DENVER DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE

    2026 Emergency Wastewater Repairs

    Issued by City and County of Denver Department of Transportation and Infrastructure
    countyIFBCity and County of Denver Department of Transportation and InfrastructureSol. 8845276862
    Open · 15d remaining
    DAYS TO CLOSE
    15
    due Jun 18, 2026
    PUBLISHED
    May 19, 2026
    Posting date
    JURISDICTION
    City and
    county
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City and County of Denver seeks bids for a 3-year contract to perform emergency wastewater repair construction, including sewer, water quality, and lift station repairs. Bids due June 18, 2026, via electronic submission. Pre-bid conference on May 28, 2026.

    Opportunity details

    Solicitation No.
    8845276862
    Type / RFx
    IFB
    Status
    Active
    Level
    county
    Published Date
    May 19, 2026
    Due Date
    June 18, 2026
    NAICS Code
    237110AI guide
    Agency
    City and County of Denver Department of Transportation and Infrastructure

    Description

    The City and County of Denver Department of Transportation & Infrastructure Wastewater Management Division requires a 3-year long contract to perform wastewater emergency repair construction work. This contract will be utilized on an as-needed basis for multiple emergency repairs. Contract term is three years and the maximum contract amount is $3,000,000.00 (contract amount is no guarantee of work). All work needs to follow City and County of Denver specifications, standard details, and criteria. The following is a general outline and description of work for the Emergency Repair to Wastewater Facility project for WMD Construction Operations. The work includes any construction repairs on wastewater facilities (ponds, outfall, etc…), water quality facilities (ponds, outfalls, trash racks, etc…), and sewer (storm and sanitary conduits) components including,but not limited to: Excavations, Plumbing, Trucking, Paving, Landscaping, Reinforced concrete structures, etc., Lift station and pump station repair is also needed. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.2323729.C14847676 **Piggyback Contract**: No **Question Acceptance Deadline**: 06/04/2026 12:00 PM EDT **Questions are submitted online**: No **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: Bids will be received and accepted via the online electronic bid service, Rocky Mountain E-Purchasing (“BidNet”). Bids must be submitted via BidNet no later than June 18, 2026 at 10:00 a.m. Prospective bidders must be on the plan holders list on BidNet for bids to be accepted. To access the electronic bid form, download the required documents from BidNet and complete the Unit Item Pricing in the Documents & Items section of the solicitation. All properly uploaded bids will then be opened, witnessed, and read aloud. To access the bid opening teleconference, please call 720-388-6219 and enter conference ID: 273 692 513# or join via Microsoft Teams. Link to join via Microsoft Team available on the project page at www.denvergov.org/DoBusinesswithDOTI. For any questions or issues submitting a bid, please contact Bidnet Direct Vendor Support at 800-835-4603, option 2. **Owner Organization**: City and County of Denver Department of Transportation and Infrastructure **Reference Number**: 0000422670 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 05/28/2026 12:00 PM EDT | Location: Via Teams Meeting | Event Note: Virtual Pre-Submittal Meeting on May 28, 2026 at 10:00 a.m. local time To access the meeting, please call 720-388-6219 and enter conference ID: 304 384 006#. – Details to access the meeting can be found on the project page at www.denvergov.org/DoBusinesswithDOTI. **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | Price | Code | Description | Price | |---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Next Project 1 Next Labor-Base Bid - Labor STANDARD Code Description UOM Qty 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 Next Subcontractor-Base Bid STANDARD Code Description UOM Qty 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 Next Allowance Acct-A/A Bid COST ALLOWANCE Code Description Price 01-21.13.01A Water Treatment Equipment $60,000.00 01-21.13.01B Traffic Control Rental Equipment, Devices, Etc $100,000.00 01-21.13.01C All Construction Equipment $380,000.00 01-21.26.05A Water Works $400,000.00 01-21.26.05B Stone/Aggregates $50,000.00 01-21.26.05C Concrete/Masonry Products/Forms/Reinforcing Steel $200,000.00 01-21.26.05D Asphalt materials $200,000.00 01-21.26.05E Pre-Cast Materials/Reinforced Concrete Pipe and Manholes $100,000.00 01-21.26.05F Reinforced Polymer Mortar Pipe Materials $20,000.00 01-21.26.05G Landscape Products/Materials $30,000.00 01-21.26.05H Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material $50,000.00 01-21.26.05I Erosion Control Measures (Materials Only) $80,000.00 01-21.26.05J Water Treatment Filter Media, Consumables $60,000.00 Next Textura Fee-Base Bid - Textura Fee COST ALLOWANCE Code Description Price Textura Fee Textura Fee Refer to BF-3 $6,435.00 | Next Labor-Base Bid - Labor STANDARD Code Description UOM Qty 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | Code Description UOM Qty | 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | 1 | Estimator | Hour | 80 | 2 | Project Manager | Hour | 80 | 3 | Superintendent | Hour | 160 | 4 | Foreman | Hour | 160 | 5 | Erosion Control Supervisor | Hour | 40 | 6 | Engineer - Civil | Hour | 40 | 7 | Laborer Group 1 Construction | Hour | 160 | 8 | Laborer Group 2 Construction | Hour | 160 | 9 | Common Laborer | Hour | 160 | 10 | Concrete Laborer | Hour | 160 | 11 | Landscape/Irrigation Laborer | Hour | 40 | 12 | Landscape Foreman | Hour | 40 | 13 | Pipelayer | Hour | 160 | 14 | Pipefitter | Hour | 160 | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | 16 | Carpenter: Structures | Hour | 80 | 17 | Carpenter: Flat Work | Hour | 80 | 18 | Carpenter: Concrete All Other Work | Hour | 80 | 19 | Cement Mason | Hour | 80 | 20 | Concrete Finisher | Hour | 80 | 21 | Ironworker, Reinforcing | Hour | 80 | 22 | Master Electrician | Hour | 80 | 23 | Journeyman Electrician | Hour | 80 | 24 | Lift Station Mechanic | Hour | 80 | 25 | Master Plumber | Hour | 80 | 26 | Welder (Certified) | Hour | 80 | 27 | Backhoe Operator | Hour | 160 | 28 | Forklift Operator | Hour | 40 | 29 | Skid Loader Operator | Hour | 160 | 30 | Broom/Sweeper Operator | Hour | 40 | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | 33 | 100-200 Ton Crane Operator | Hour | 40 | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | 36 | Mechanic | Hour | 40 | 37 | Fueler/Oiler | Hour | 40 | 38 | Tandem Dump Truck Driver | Hour | 160 | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | 40 | Lowboy Semi Truck Driver | Hour | 40 | 41 | Water Truck Driver | Hour | 40 | 42 | Traffic Control Flagger | Hour | 80 | 43 | Traffic Control Supervisor | Hour | 80 | 44 | Traffic Control Laborer | Hour | 80 | 45 | Uniform Traffic Control | Hour | 40 | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | 55 | Structural Engineer | Hour | 12.8 | 56 | Real Estate Attorney | Hour | 7.68 | 57 | Environmental Engineer | Hour | 12.8 | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | 59 | Asbestos Removal Laborer | Hour | 12.8 | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | 61 | Drill Rig Labor | Hour | 12.8 | 62 | Drill Rig Operator | Hour | 12.8 | 63 | Industrial Hygienist | Hour | 12.8 | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | Next Subcontractor-Base Bid STANDARD Code Description UOM Qty 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | Code Description UOM Qty | 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | 202-00019 | REMOVAL OF INLET | Each | 5 | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | Next Allowance Acct-A/A Bid COST ALLOWANCE Code Description Price 01-21.13.01A Water Treatment Equipment $60,000.00 01-21.13.01B Traffic Control Rental Equipment, Devices, Etc $100,000.00 01-21.13.01C All Construction Equipment $380,000.00 01-21.26.05A Water Works $400,000.00 01-21.26.05B Stone/Aggregates $50,000.00 01-21.26.05C Concrete/Masonry Products/Forms/Reinforcing Steel $200,000.00 01-21.26.05D Asphalt materials $200,000.00 01-21.26.05E Pre-Cast Materials/Reinforced Concrete Pipe and Manholes $100,000.00 01-21.26.05F Reinforced Polymer Mortar Pipe Materials $20,000.00 01-21.26.05G Landscape Products/Materials $30,000.00 01-21.26.05H Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material $50,000.00 01-21.26.05I Erosion Control Measures (Materials Only) $80,000.00 01-21.26.05J Water Treatment Filter Media, Consumables $60,000.00 | 01-21.13.01A | Water Treatment Equipment | $60,000.00 | 01-21.13.01B | Traffic Control Rental Equipment, Devices, Etc | $100,000.00 | 01-21.13.01C | All Construction Equipment | $380,000.00 | 01-21.26.05A | Water Works | $400,000.00 | 01-21.26.05B | Stone/Aggregates | $50,000.00 | 01-21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | $200,000.00 | 01-21.26.05D | Asphalt materials | $200,000.00 | 01-21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | $100,000.00 | 01-21.26.05F | Reinforced Polymer Mortar Pipe Materials | $20,000.00 | 01-21.26.05G | Landscape Products/Materials | $30,000.00 | 01-21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | $50,000.00 | 01-21.26.05I | Erosion Control Measures (Materials Only) | $80,000.00 | 01-21.26.05J | Water Treatment Filter Media, Consumables | $60,000.00 | | Next Textura Fee-Base Bid - Textura Fee COST ALLOWANCE Code Description Price Textura Fee Textura Fee Refer to BF-3 $6,435.00 | Textura Fee | Textura Fee Refer to BF-3 | $6,435.00 | | | | Next Labor-Base Bid - Labor STANDARD Code Description UOM Qty 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | Code Description UOM Qty | 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | 1 | Estimator | Hour | 80 | 2 | Project Manager | Hour | 80 | 3 | Superintendent | Hour | 160 | 4 | Foreman | Hour | 160 | 5 | Erosion Control Supervisor | Hour | 40 | 6 | Engineer - Civil | Hour | 40 | 7 | Laborer Group 1 Construction | Hour | 160 | 8 | Laborer Group 2 Construction | Hour | 160 | 9 | Common Laborer | Hour | 160 | 10 | Concrete Laborer | Hour | 160 | 11 | Landscape/Irrigation Laborer | Hour | 40 | 12 | Landscape Foreman | Hour | 40 | 13 | Pipelayer | Hour | 160 | 14 | Pipefitter | Hour | 160 | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | 16 | Carpenter: Structures | Hour | 80 | 17 | Carpenter: Flat Work | Hour | 80 | 18 | Carpenter: Concrete All Other Work | Hour | 80 | 19 | Cement Mason | Hour | 80 | 20 | Concrete Finisher | Hour | 80 | 21 | Ironworker, Reinforcing | Hour | 80 | 22 | Master Electrician | Hour | 80 | 23 | Journeyman Electrician | Hour | 80 | 24 | Lift Station Mechanic | Hour | 80 | 25 | Master Plumber | Hour | 80 | 26 | Welder (Certified) | Hour | 80 | 27 | Backhoe Operator | Hour | 160 | 28 | Forklift Operator | Hour | 40 | 29 | Skid Loader Operator | Hour | 160 | 30 | Broom/Sweeper Operator | Hour | 40 | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | 33 | 100-200 Ton Crane Operator | Hour | 40 | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | 36 | Mechanic | Hour | 40 | 37 | Fueler/Oiler | Hour | 40 | 38 | Tandem Dump Truck Driver | Hour | 160 | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | 40 | Lowboy Semi Truck Driver | Hour | 40 | 41 | Water Truck Driver | Hour | 40 | 42 | Traffic Control Flagger | Hour | 80 | 43 | Traffic Control Supervisor | Hour | 80 | 44 | Traffic Control Laborer | Hour | 80 | 45 | Uniform Traffic Control | Hour | 40 | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | 55 | Structural Engineer | Hour | 12.8 | 56 | Real Estate Attorney | Hour | 7.68 | 57 | Environmental Engineer | Hour | 12.8 | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | 59 | Asbestos Removal Laborer | Hour | 12.8 | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | 61 | Drill Rig Labor | Hour | 12.8 | 62 | Drill Rig Operator | Hour | 12.8 | 63 | Industrial Hygienist | Hour | 12.8 | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | | Code Description UOM Qty | | 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | 1 | Estimator | Hour | 80 | 2 | Project Manager | Hour | 80 | 3 | Superintendent | Hour | 160 | 4 | Foreman | Hour | 160 | 5 | Erosion Control Supervisor | Hour | 40 | 6 | Engineer - Civil | Hour | 40 | 7 | Laborer Group 1 Construction | Hour | 160 | 8 | Laborer Group 2 Construction | Hour | 160 | 9 | Common Laborer | Hour | 160 | 10 | Concrete Laborer | Hour | 160 | 11 | Landscape/Irrigation Laborer | Hour | 40 | 12 | Landscape Foreman | Hour | 40 | 13 | Pipelayer | Hour | 160 | 14 | Pipefitter | Hour | 160 | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | 16 | Carpenter: Structures | Hour | 80 | 17 | Carpenter: Flat Work | Hour | 80 | 18 | Carpenter: Concrete All Other Work | Hour | 80 | 19 | Cement Mason | Hour | 80 | 20 | Concrete Finisher | Hour | 80 | 21 | Ironworker, Reinforcing | Hour | 80 | 22 | Master Electrician | Hour | 80 | 23 | Journeyman Electrician | Hour | 80 | 24 | Lift Station Mechanic | Hour | 80 | 25 | Master Plumber | Hour | 80 | 26 | Welder (Certified) | Hour | 80 | 27 | Backhoe Operator | Hour | 160 | 28 | Forklift Operator | Hour | 40 | 29 | Skid Loader Operator | Hour | 160 | 30 | Broom/Sweeper Operator | Hour | 40 | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | 33 | 100-200 Ton Crane Operator | Hour | 40 | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | 36 | Mechanic | Hour | 40 | 37 | Fueler/Oiler | Hour | 40 | 38 | Tandem Dump Truck Driver | Hour | 160 | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | 40 | Lowboy Semi Truck Driver | Hour | 40 | 41 | Water Truck Driver | Hour | 40 | 42 | Traffic Control Flagger | Hour | 80 | 43 | Traffic Control Supervisor | Hour | 80 | 44 | Traffic Control Laborer | Hour | 80 | 45 | Uniform Traffic Control | Hour | 40 | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | 55 | Structural Engineer | Hour | 12.8 | 56 | Real Estate Attorney | Hour | 7.68 | 57 | Environmental Engineer | Hour | 12.8 | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | 59 | Asbestos Removal Laborer | Hour | 12.8 | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | 61 | Drill Rig Labor | Hour | 12.8 | 62 | Drill Rig Operator | Hour | 12.8 | 63 | Industrial Hygienist | Hour | 12.8 | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | | 1 | Estimator | Hour | 80 | | 2 | Project Manager | Hour | 80 | | 3 | Superintendent | Hour | 160 | | 4 | Foreman | Hour | 160 | | 5 | Erosion Control Supervisor | Hour | 40 | | 6 | Engineer - Civil | Hour | 40 | | 7 | Laborer Group 1 Construction | Hour | 160 | | 8 | Laborer Group 2 Construction | Hour | 160 | | 9 | Common Laborer | Hour | 160 | | 10 | Concrete Laborer | Hour | 160 | | 11 | Landscape/Irrigation Laborer | Hour | 40 | | 12 | Landscape Foreman | Hour | 40 | | 13 | Pipelayer | Hour | 160 | | 14 | Pipefitter | Hour | 160 | | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | | 16 | Carpenter: Structures | Hour | 80 | | 17 | Carpenter: Flat Work | Hour | 80 | | 18 | Carpenter: Concrete All Other Work | Hour | 80 | | 19 | Cement Mason | Hour | 80 | | 20 | Concrete Finisher | Hour | 80 | | 21 | Ironworker, Reinforcing | Hour | 80 | | 22 | Master Electrician | Hour | 80 | | 23 | Journeyman Electrician | Hour | 80 | | 24 | Lift Station Mechanic | Hour | 80 | | 25 | Master Plumber | Hour | 80 | | 26 | Welder (Certified) | Hour | 80 | | 27 | Backhoe Operator | Hour | 160 | | 28 | Forklift Operator | Hour | 40 | | 29 | Skid Loader Operator | Hour | 160 | | 30 | Broom/Sweeper Operator | Hour | 40 | | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | | 33 | 100-200 Ton Crane Operator | Hour | 40 | | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | | 36 | Mechanic | Hour | 40 | | 37 | Fueler/Oiler | Hour | 40 | | 38 | Tandem Dump Truck Driver | Hour | 160 | | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | | 40 | Lowboy Semi Truck Driver | Hour | 40 | | 41 | Water Truck Driver | Hour | 40 | | 42 | Traffic Control Flagger | Hour | 80 | | 43 | Traffic Control Supervisor | Hour | 80 | | 44 | Traffic Control Laborer | Hour | 80 | | 45 | Uniform Traffic Control | Hour | 40 | | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | | 55 | Structural Engineer | Hour | 12.8 | | 56 | Real Estate Attorney | Hour | 7.68 | | 57 | Environmental Engineer | Hour | 12.8 | | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | | 59 | Asbestos Removal Laborer | Hour | 12.8 | | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | | 61 | Drill Rig Labor | Hour | 12.8 | | 62 | Drill Rig Operator | Hour | 12.8 | | 63 | Industrial Hygienist | Hour | 12.8 | | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | Next Subcontractor-Base Bid STANDARD Code Description UOM Qty 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | Code Description UOM Qty | 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | 202-00019 | REMOVAL OF INLET | Each | 5 | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | | Code Description UOM Qty | | 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | 202-00019 | REMOVAL OF INLET | Each | 5 | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | | 202-00019 | REMOVAL OF INLET | Each | 5 | | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | Next Allowance Acct-A/A Bid COST ALLOWANCE Code Description Price 01-21.13.01A Water Treatment Equipment $60,000.00 01-21.13.01B Traffic Control Rental Equipment, Devices, Etc $100,000.00 01-21.13.01C All Construction Equipment $380,000.00 01-21.26.05A Water Works $400,000.00 01-21.26.05B Stone/Aggregates $50,000.00 01-21.26.05C Concrete/Masonry Products/Forms/Reinforcing Steel $200,000.00 01-21.26.05D Asphalt materials $200,000.00 01-21.26.05E Pre-Cast Materials/Reinforced Concrete Pipe and Manholes $100,000.00 01-21.26.05F Reinforced Polymer Mortar Pipe Materials $20,000.00 01-21.26.05G Landscape Products/Materials $30,000.00 01-21.26.05H Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material $50,000.00 01-21.26.05I Erosion Control Measures (Materials Only) $80,000.00 01-21.26.05J Water Treatment Filter Media, Consumables $60,000.00 | 01-21.13.01A | Water Treatment Equipment | $60,000.00 | 01-21.13.01B | Traffic Control Rental Equipment, Devices, Etc | $100,000.00 | 01-21.13.01C | All Construction Equipment | $380,000.00 | 01-21.26.05A | Water Works | $400,000.00 | 01-21.26.05B | Stone/Aggregates | $50,000.00 | 01-21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | $200,000.00 | 01-21.26.05D | Asphalt materials | $200,000.00 | 01-21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | $100,000.00 | 01-21.26.05F | Reinforced Polymer Mortar Pipe Materials | $20,000.00 | 01-21.26.05G | Landscape Products/Materials | $30,000.00 | 01-21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | $50,000.00 | 01-21.26.05I | Erosion Control Measures (Materials Only) | $80,000.00 | 01-21.26.05J | Water Treatment Filter Media, Consumables | $60,000.00 | | | 01-21.13.01A | Water Treatment Equipment | $60,000.00 | | 01-21.13.01B | Traffic Control Rental Equipment, Devices, Etc | $100,000.00 | | 01-21.13.01C | All Construction Equipment | $380,000.00 | | 01-21.26.05A | Water Works | $400,000.00 | | 01-21.26.05B | Stone/Aggregates | $50,000.00 | | 01-21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | $200,000.00 | | 01-21.26.05D | Asphalt materials | $200,000.00 | | 01-21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | $100,000.00 | | 01-21.26.05F | Reinforced Polymer Mortar Pipe Materials | $20,000.00 | | 01-21.26.05G | Landscape Products/Materials | $30,000.00 | | 01-21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | $50,000.00 | | 01-21.26.05I | Erosion Control Measures (Materials Only) | $80,000.00 | | 01-21.26.05J | Water Treatment Filter Media, Consumables | $60,000.00 | | Next Textura Fee-Base Bid - Textura Fee COST ALLOWANCE Code Description Price Textura Fee Textura Fee Refer to BF-3 $6,435.00 | Textura Fee | Textura Fee Refer to BF-3 | $6,435.00 | | | Textura Fee | Textura Fee Refer to BF-3 | $6,435.00 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | Price | Code | Description | Price | |---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Next Labor-Base Bid - Labor STANDARD Code Description UOM Qty 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | Code Description UOM Qty | 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | 1 | Estimator | Hour | 80 | 2 | Project Manager | Hour | 80 | 3 | Superintendent | Hour | 160 | 4 | Foreman | Hour | 160 | 5 | Erosion Control Supervisor | Hour | 40 | 6 | Engineer - Civil | Hour | 40 | 7 | Laborer Group 1 Construction | Hour | 160 | 8 | Laborer Group 2 Construction | Hour | 160 | 9 | Common Laborer | Hour | 160 | 10 | Concrete Laborer | Hour | 160 | 11 | Landscape/Irrigation Laborer | Hour | 40 | 12 | Landscape Foreman | Hour | 40 | 13 | Pipelayer | Hour | 160 | 14 | Pipefitter | Hour | 160 | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | 16 | Carpenter: Structures | Hour | 80 | 17 | Carpenter: Flat Work | Hour | 80 | 18 | Carpenter: Concrete All Other Work | Hour | 80 | 19 | Cement Mason | Hour | 80 | 20 | Concrete Finisher | Hour | 80 | 21 | Ironworker, Reinforcing | Hour | 80 | 22 | Master Electrician | Hour | 80 | 23 | Journeyman Electrician | Hour | 80 | 24 | Lift Station Mechanic | Hour | 80 | 25 | Master Plumber | Hour | 80 | 26 | Welder (Certified) | Hour | 80 | 27 | Backhoe Operator | Hour | 160 | 28 | Forklift Operator | Hour | 40 | 29 | Skid Loader Operator | Hour | 160 | 30 | Broom/Sweeper Operator | Hour | 40 | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | 33 | 100-200 Ton Crane Operator | Hour | 40 | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | 36 | Mechanic | Hour | 40 | 37 | Fueler/Oiler | Hour | 40 | 38 | Tandem Dump Truck Driver | Hour | 160 | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | 40 | Lowboy Semi Truck Driver | Hour | 40 | 41 | Water Truck Driver | Hour | 40 | 42 | Traffic Control Flagger | Hour | 80 | 43 | Traffic Control Supervisor | Hour | 80 | 44 | Traffic Control Laborer | Hour | 80 | 45 | Uniform Traffic Control | Hour | 40 | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | 55 | Structural Engineer | Hour | 12.8 | 56 | Real Estate Attorney | Hour | 7.68 | 57 | Environmental Engineer | Hour | 12.8 | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | 59 | Asbestos Removal Laborer | Hour | 12.8 | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | 61 | Drill Rig Labor | Hour | 12.8 | 62 | Drill Rig Operator | Hour | 12.8 | 63 | Industrial Hygienist | Hour | 12.8 | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | | Code Description UOM Qty | | 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | 1 | Estimator | Hour | 80 | 2 | Project Manager | Hour | 80 | 3 | Superintendent | Hour | 160 | 4 | Foreman | Hour | 160 | 5 | Erosion Control Supervisor | Hour | 40 | 6 | Engineer - Civil | Hour | 40 | 7 | Laborer Group 1 Construction | Hour | 160 | 8 | Laborer Group 2 Construction | Hour | 160 | 9 | Common Laborer | Hour | 160 | 10 | Concrete Laborer | Hour | 160 | 11 | Landscape/Irrigation Laborer | Hour | 40 | 12 | Landscape Foreman | Hour | 40 | 13 | Pipelayer | Hour | 160 | 14 | Pipefitter | Hour | 160 | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | 16 | Carpenter: Structures | Hour | 80 | 17 | Carpenter: Flat Work | Hour | 80 | 18 | Carpenter: Concrete All Other Work | Hour | 80 | 19 | Cement Mason | Hour | 80 | 20 | Concrete Finisher | Hour | 80 | 21 | Ironworker, Reinforcing | Hour | 80 | 22 | Master Electrician | Hour | 80 | 23 | Journeyman Electrician | Hour | 80 | 24 | Lift Station Mechanic | Hour | 80 | 25 | Master Plumber | Hour | 80 | 26 | Welder (Certified) | Hour | 80 | 27 | Backhoe Operator | Hour | 160 | 28 | Forklift Operator | Hour | 40 | 29 | Skid Loader Operator | Hour | 160 | 30 | Broom/Sweeper Operator | Hour | 40 | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | 33 | 100-200 Ton Crane Operator | Hour | 40 | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | 36 | Mechanic | Hour | 40 | 37 | Fueler/Oiler | Hour | 40 | 38 | Tandem Dump Truck Driver | Hour | 160 | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | 40 | Lowboy Semi Truck Driver | Hour | 40 | 41 | Water Truck Driver | Hour | 40 | 42 | Traffic Control Flagger | Hour | 80 | 43 | Traffic Control Supervisor | Hour | 80 | 44 | Traffic Control Laborer | Hour | 80 | 45 | Uniform Traffic Control | Hour | 40 | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | 55 | Structural Engineer | Hour | 12.8 | 56 | Real Estate Attorney | Hour | 7.68 | 57 | Environmental Engineer | Hour | 12.8 | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | 59 | Asbestos Removal Laborer | Hour | 12.8 | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | 61 | Drill Rig Labor | Hour | 12.8 | 62 | Drill Rig Operator | Hour | 12.8 | 63 | Industrial Hygienist | Hour | 12.8 | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | | 1 | Estimator | Hour | 80 | | 2 | Project Manager | Hour | 80 | | 3 | Superintendent | Hour | 160 | | 4 | Foreman | Hour | 160 | | 5 | Erosion Control Supervisor | Hour | 40 | | 6 | Engineer - Civil | Hour | 40 | | 7 | Laborer Group 1 Construction | Hour | 160 | | 8 | Laborer Group 2 Construction | Hour | 160 | | 9 | Common Laborer | Hour | 160 | | 10 | Concrete Laborer | Hour | 160 | | 11 | Landscape/Irrigation Laborer | Hour | 40 | | 12 | Landscape Foreman | Hour | 40 | | 13 | Pipelayer | Hour | 160 | | 14 | Pipefitter | Hour | 160 | | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | | 16 | Carpenter: Structures | Hour | 80 | | 17 | Carpenter: Flat Work | Hour | 80 | | 18 | Carpenter: Concrete All Other Work | Hour | 80 | | 19 | Cement Mason | Hour | 80 | | 20 | Concrete Finisher | Hour | 80 | | 21 | Ironworker, Reinforcing | Hour | 80 | | 22 | Master Electrician | Hour | 80 | | 23 | Journeyman Electrician | Hour | 80 | | 24 | Lift Station Mechanic | Hour | 80 | | 25 | Master Plumber | Hour | 80 | | 26 | Welder (Certified) | Hour | 80 | | 27 | Backhoe Operator | Hour | 160 | | 28 | Forklift Operator | Hour | 40 | | 29 | Skid Loader Operator | Hour | 160 | | 30 | Broom/Sweeper Operator | Hour | 40 | | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | | 33 | 100-200 Ton Crane Operator | Hour | 40 | | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | | 36 | Mechanic | Hour | 40 | | 37 | Fueler/Oiler | Hour | 40 | | 38 | Tandem Dump Truck Driver | Hour | 160 | | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | | 40 | Lowboy Semi Truck Driver | Hour | 40 | | 41 | Water Truck Driver | Hour | 40 | | 42 | Traffic Control Flagger | Hour | 80 | | 43 | Traffic Control Supervisor | Hour | 80 | | 44 | Traffic Control Laborer | Hour | 80 | | 45 | Uniform Traffic Control | Hour | 40 | | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | | 55 | Structural Engineer | Hour | 12.8 | | 56 | Real Estate Attorney | Hour | 7.68 | | 57 | Environmental Engineer | Hour | 12.8 | | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | | 59 | Asbestos Removal Laborer | Hour | 12.8 | | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | | 61 | Drill Rig Labor | Hour | 12.8 | | 62 | Drill Rig Operator | Hour | 12.8 | | 63 | Industrial Hygienist | Hour | 12.8 | | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | Next Subcontractor-Base Bid STANDARD Code Description UOM Qty 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | Code Description UOM Qty | 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | 202-00019 | REMOVAL OF INLET | Each | 5 | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | | Code Description UOM Qty | | 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | 202-00019 | REMOVAL OF INLET | Each | 5 | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | | 202-00019 | REMOVAL OF INLET | Each | 5 | | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | Next Allowance Acct-A/A Bid COST ALLOWANCE Code Description Price 01-21.13.01A Water Treatment Equipment $60,000.00 01-21.13.01B Traffic Control Rental Equipment, Devices, Etc $100,000.00 01-21.13.01C All Construction Equipment $380,000.00 01-21.26.05A Water Works $400,000.00 01-21.26.05B Stone/Aggregates $50,000.00 01-21.26.05C Concrete/Masonry Products/Forms/Reinforcing Steel $200,000.00 01-21.26.05D Asphalt materials $200,000.00 01-21.26.05E Pre-Cast Materials/Reinforced Concrete Pipe and Manholes $100,000.00 01-21.26.05F Reinforced Polymer Mortar Pipe Materials $20,000.00 01-21.26.05G Landscape Products/Materials $30,000.00 01-21.26.05H Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material $50,000.00 01-21.26.05I Erosion Control Measures (Materials Only) $80,000.00 01-21.26.05J Water Treatment Filter Media, Consumables $60,000.00 | 01-21.13.01A | Water Treatment Equipment | $60,000.00 | 01-21.13.01B | Traffic Control Rental Equipment, Devices, Etc | $100,000.00 | 01-21.13.01C | All Construction Equipment | $380,000.00 | 01-21.26.05A | Water Works | $400,000.00 | 01-21.26.05B | Stone/Aggregates | $50,000.00 | 01-21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | $200,000.00 | 01-21.26.05D | Asphalt materials | $200,000.00 | 01-21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | $100,000.00 | 01-21.26.05F | Reinforced Polymer Mortar Pipe Materials | $20,000.00 | 01-21.26.05G | Landscape Products/Materials | $30,000.00 | 01-21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | $50,000.00 | 01-21.26.05I | Erosion Control Measures (Materials Only) | $80,000.00 | 01-21.26.05J | Water Treatment Filter Media, Consumables | $60,000.00 | | | 01-21.13.01A | Water Treatment Equipment | $60,000.00 | | 01-21.13.01B | Traffic Control Rental Equipment, Devices, Etc | $100,000.00 | | 01-21.13.01C | All Construction Equipment | $380,000.00 | | 01-21.26.05A | Water Works | $400,000.00 | | 01-21.26.05B | Stone/Aggregates | $50,000.00 | | 01-21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | $200,000.00 | | 01-21.26.05D | Asphalt materials | $200,000.00 | | 01-21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | $100,000.00 | | 01-21.26.05F | Reinforced Polymer Mortar Pipe Materials | $20,000.00 | | 01-21.26.05G | Landscape Products/Materials | $30,000.00 | | 01-21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | $50,000.00 | | 01-21.26.05I | Erosion Control Measures (Materials Only) | $80,000.00 | | 01-21.26.05J | Water Treatment Filter Media, Consumables | $60,000.00 | | Next Textura Fee-Base Bid - Textura Fee COST ALLOWANCE Code Description Price Textura Fee Textura Fee Refer to BF-3 $6,435.00 | Textura Fee | Textura Fee Refer to BF-3 | $6,435.00 | | | Textura Fee | Textura Fee Refer to BF-3 | $6,435.00 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Estimator Hour 80 2 Project Manager Hour 80 3 Superintendent Hour 160 4 Foreman Hour 160 5 Erosion Control Supervisor Hour 40 6 Engineer - Civil Hour 40 7 Laborer Group 1 Construction Hour 160 8 Laborer Group 2 Construction Hour 160 9 Common Laborer Hour 160 10 Concrete Laborer Hour 160 11 Landscape/Irrigation Laborer Hour 40 12 Landscape Foreman Hour 40 13 Pipelayer Hour 160 14 Pipefitter Hour 160 15 Carpenter: Concrete Form Building and Setting Hour 80 16 Carpenter: Structures Hour 80 17 Carpenter: Flat Work Hour 80 18 Carpenter: Concrete All Other Work Hour 80 19 Cement Mason Hour 80 20 Concrete Finisher Hour 80 21 Ironworker, Reinforcing Hour 80 22 Master Electrician Hour 80 23 Journeyman Electrician Hour 80 24 Lift Station Mechanic Hour 80 25 Master Plumber Hour 80 26 Welder (Certified) Hour 80 27 Backhoe Operator Hour 160 28 Forklift Operator Hour 40 29 Skid Loader Operator Hour 160 30 Broom/Sweeper Operator Hour 40 31 Motor Grader Operator (Rough and Finish) Hour 40 32 Roller/Compactor Operator (Dirt and Grade Compaction) Hour 160 33 100-200 Ton Crane Operator Hour 40 34 Excavator Operator (Mini, Small and Large Size) Hour 160 35 Loader Operator (Mini, Small and Large Size) Hour 160 36 Mechanic Hour 40 37 Fueler/Oiler Hour 40 38 Tandem Dump Truck Driver Hour 160 39 End Dump/Side Dump Semi Truck Driver Hour 160 40 Lowboy Semi Truck Driver Hour 40 41 Water Truck Driver Hour 40 42 Traffic Control Flagger Hour 80 43 Traffic Control Supervisor Hour 80 44 Traffic Control Laborer Hour 80 45 Uniform Traffic Control Hour 40 46 Profile Epoxy Paint Truck Operator Hour 40 47 Multi-Purpose Specialty & Hoisting Truck Operator/Driver Hour 40 48 CCTV Inspection Foreman Linear Foot/Feet 3200 49 CCTV Inspection Operator Linear Foot/Feet 3200 50 CCTV Inspection Laborer Linear Foot/Feet 3200 51 Hydro-Excavation/Potholing Crew Hour 25.6 52 Combination Vac/Jet Foreman Linear Foot/Feet 3200 53 Combination Vac/Jet Operator Linear Foot/Feet 3200 54 Combination Vac/Jet Laborer Linear Foot/Feet 3200 55 Structural Engineer Hour 12.8 56 Real Estate Attorney Hour 7.68 57 Environmental Engineer Hour 12.8 58 State of CO Certified Asbestos Building Inspector (CABI) Hour 12.8 59 Asbestos Removal Laborer Hour 12.8 60 Environmental Boring/Sampling Labor Hour 12.8 61 Drill Rig Labor Hour 12.8 62 Drill Rig Operator Hour 12.8 63 Industrial Hygienist Hour 12.8 64 Warranty, Performance and Payment Bonding for Duration of Project Lump-Sum 1 | 1 | Estimator | Hour | 80 | 2 | Project Manager | Hour | 80 | 3 | Superintendent | Hour | 160 | 4 | Foreman | Hour | 160 | 5 | Erosion Control Supervisor | Hour | 40 | 6 | Engineer - Civil | Hour | 40 | 7 | Laborer Group 1 Construction | Hour | 160 | 8 | Laborer Group 2 Construction | Hour | 160 | 9 | Common Laborer | Hour | 160 | 10 | Concrete Laborer | Hour | 160 | 11 | Landscape/Irrigation Laborer | Hour | 40 | 12 | Landscape Foreman | Hour | 40 | 13 | Pipelayer | Hour | 160 | 14 | Pipefitter | Hour | 160 | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | 16 | Carpenter: Structures | Hour | 80 | 17 | Carpenter: Flat Work | Hour | 80 | 18 | Carpenter: Concrete All Other Work | Hour | 80 | 19 | Cement Mason | Hour | 80 | 20 | Concrete Finisher | Hour | 80 | 21 | Ironworker, Reinforcing | Hour | 80 | 22 | Master Electrician | Hour | 80 | 23 | Journeyman Electrician | Hour | 80 | 24 | Lift Station Mechanic | Hour | 80 | 25 | Master Plumber | Hour | 80 | 26 | Welder (Certified) | Hour | 80 | 27 | Backhoe Operator | Hour | 160 | 28 | Forklift Operator | Hour | 40 | 29 | Skid Loader Operator | Hour | 160 | 30 | Broom/Sweeper Operator | Hour | 40 | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | 33 | 100-200 Ton Crane Operator | Hour | 40 | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | 36 | Mechanic | Hour | 40 | 37 | Fueler/Oiler | Hour | 40 | 38 | Tandem Dump Truck Driver | Hour | 160 | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | 40 | Lowboy Semi Truck Driver | Hour | 40 | 41 | Water Truck Driver | Hour | 40 | 42 | Traffic Control Flagger | Hour | 80 | 43 | Traffic Control Supervisor | Hour | 80 | 44 | Traffic Control Laborer | Hour | 80 | 45 | Uniform Traffic Control | Hour | 40 | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | 55 | Structural Engineer | Hour | 12.8 | 56 | Real Estate Attorney | Hour | 7.68 | 57 | Environmental Engineer | Hour | 12.8 | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | 59 | Asbestos Removal Laborer | Hour | 12.8 | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | 61 | Drill Rig Labor | Hour | 12.8 | 62 | Drill Rig Operator | Hour | 12.8 | 63 | Industrial Hygienist | Hour | 12.8 | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | | | 1 | Estimator | Hour | 80 | | 2 | Project Manager | Hour | 80 | | 3 | Superintendent | Hour | 160 | | 4 | Foreman | Hour | 160 | | 5 | Erosion Control Supervisor | Hour | 40 | | 6 | Engineer - Civil | Hour | 40 | | 7 | Laborer Group 1 Construction | Hour | 160 | | 8 | Laborer Group 2 Construction | Hour | 160 | | 9 | Common Laborer | Hour | 160 | | 10 | Concrete Laborer | Hour | 160 | | 11 | Landscape/Irrigation Laborer | Hour | 40 | | 12 | Landscape Foreman | Hour | 40 | | 13 | Pipelayer | Hour | 160 | | 14 | Pipefitter | Hour | 160 | | 15 | Carpenter: Concrete Form Building and Setting | Hour | 80 | | 16 | Carpenter: Structures | Hour | 80 | | 17 | Carpenter: Flat Work | Hour | 80 | | 18 | Carpenter: Concrete All Other Work | Hour | 80 | | 19 | Cement Mason | Hour | 80 | | 20 | Concrete Finisher | Hour | 80 | | 21 | Ironworker, Reinforcing | Hour | 80 | | 22 | Master Electrician | Hour | 80 | | 23 | Journeyman Electrician | Hour | 80 | | 24 | Lift Station Mechanic | Hour | 80 | | 25 | Master Plumber | Hour | 80 | | 26 | Welder (Certified) | Hour | 80 | | 27 | Backhoe Operator | Hour | 160 | | 28 | Forklift Operator | Hour | 40 | | 29 | Skid Loader Operator | Hour | 160 | | 30 | Broom/Sweeper Operator | Hour | 40 | | 31 | Motor Grader Operator (Rough and Finish) | Hour | 40 | | 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | Hour | 160 | | 33 | 100-200 Ton Crane Operator | Hour | 40 | | 34 | Excavator Operator (Mini, Small and Large Size) | Hour | 160 | | 35 | Loader Operator (Mini, Small and Large Size) | Hour | 160 | | 36 | Mechanic | Hour | 40 | | 37 | Fueler/Oiler | Hour | 40 | | 38 | Tandem Dump Truck Driver | Hour | 160 | | 39 | End Dump/Side Dump Semi Truck Driver | Hour | 160 | | 40 | Lowboy Semi Truck Driver | Hour | 40 | | 41 | Water Truck Driver | Hour | 40 | | 42 | Traffic Control Flagger | Hour | 80 | | 43 | Traffic Control Supervisor | Hour | 80 | | 44 | Traffic Control Laborer | Hour | 80 | | 45 | Uniform Traffic Control | Hour | 40 | | 46 | Profile Epoxy Paint Truck Operator | Hour | 40 | | 47 | Multi-Purpose Specialty & Hoisting Truck Operator/Driver | Hour | 40 | | 48 | CCTV Inspection Foreman | Linear Foot/Feet | 3200 | | 49 | CCTV Inspection Operator | Linear Foot/Feet | 3200 | | 50 | CCTV Inspection Laborer | Linear Foot/Feet | 3200 | | 51 | Hydro-Excavation/Potholing Crew | Hour | 25.6 | | 52 | Combination Vac/Jet Foreman | Linear Foot/Feet | 3200 | | 53 | Combination Vac/Jet Operator | Linear Foot/Feet | 3200 | | 54 | Combination Vac/Jet Laborer | Linear Foot/Feet | 3200 | | 55 | Structural Engineer | Hour | 12.8 | | 56 | Real Estate Attorney | Hour | 7.68 | | 57 | Environmental Engineer | Hour | 12.8 | | 58 | State of CO Certified Asbestos Building Inspector (CABI) | Hour | 12.8 | | 59 | Asbestos Removal Laborer | Hour | 12.8 | | 60 | Environmental Boring/Sampling Labor | Hour | 12.8 | | 61 | Drill Rig Labor | Hour | 12.8 | | 62 | Drill Rig Operator | Hour | 12.8 | | 63 | Industrial Hygienist | Hour | 12.8 | | 64 | Warranty, Performance and Payment Bonding for Duration of Project | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 65 Hot Mix Asphalt (HMA) (Patching) (CIP) Ton 1000 202-00220 REMOVAL OF ASPHALT MAT Square Yard 500 202-00208 REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) Square Yard 5 203-00000 UNCLASSIFIED EXCAVATION Cubic Yard 600 203-02330 3 - man subcontractor labor crew Hour 80 16-3 Chain Link Fence Linear Foot/Feet 240 202-01000 REMOVAL OF FENCE Linear Foot/Feet 100 202-00019 REMOVAL OF INLET Each 5 202-00033 REMOVAL OF SIPHON (excludes connecting inlets) Each 5 12.1.6a COMBINATION CURB, GUTTER & SIDEWALK (4'-11") Linear Foot/Feet 200 202-00200 REMOVAL OF SIDEWALK Square Yard 600 202-00201 REMOVAL OF CURBHEAD Linear Foot/Feet 80 202-00203 REMOVAL OF CURB AND GUTTER Linear Foot/Feet 600 202-00204 REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK Linear Foot/Feet 600 202-00210 REMOVAL OF CONCRETE PAVEMENT Square Yard 320 210-04020 RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) Each 5 412-00400 4" CONCRETE PAVEMENT Square Yard 100 412-00600 6" CONCRETE PAVEMENT Square Yard 100 412-00800 8" CONCRETE PAVEMENT Square Yard 250 412-01000 10" CONCRETE PAVEMENT Square Yard 100 412-01200 12" CONCRETE PAVEMENT Square Yard 100 413-00100 CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) Square Foot/Feet 20 601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK Square Foot/Feet 50 601-00400 REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL Square Foot/Feet 50 601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) Linear Foot/Feet 50 608-00000 CONCRETE SIDEWALK Square Yard 50 608-00010 CONCRETE CURB RAMP Square Yard 50 608-00018 TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY Square Foot/Feet 90 609-20000 CONCRETE GUTTER OVERLAY Linear Foot/Feet 100 609-21020 CURB & GUTTER TYPE II, SECTION 2B Linear Foot/Feet 160 609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD Linear Foot/Feet 100 609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") Linear Foot/Feet 100 609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") Linear Foot/Feet 100 610-00026 MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) Square Yard 40 | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | 202-00019 | REMOVAL OF INLET | Each | 5 | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | | | 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | Ton | 1000 | | 202-00220 | REMOVAL OF ASPHALT MAT | Square Yard | 500 | | 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | Square Yard | 5 | | 203-00000 | UNCLASSIFIED EXCAVATION | Cubic Yard | 600 | | 203-02330 | 3 - man subcontractor labor crew | Hour | 80 | | 16-3 | Chain Link Fence | Linear Foot/Feet | 240 | | 202-01000 | REMOVAL OF FENCE | Linear Foot/Feet | 100 | | 202-00019 | REMOVAL OF INLET | Each | 5 | | 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | Each | 5 | | 12.1.6a | COMBINATION CURB, GUTTER & SIDEWALK (4'-11") | Linear Foot/Feet | 200 | | 202-00200 | REMOVAL OF SIDEWALK | Square Yard | 600 | | 202-00201 | REMOVAL OF CURBHEAD | Linear Foot/Feet | 80 | | 202-00203 | REMOVAL OF CURB AND GUTTER | Linear Foot/Feet | 600 | | 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | Linear Foot/Feet | 600 | | 202-00210 | REMOVAL OF CONCRETE PAVEMENT | Square Yard | 320 | | 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | Each | 5 | | 412-00400 | 4" CONCRETE PAVEMENT | Square Yard | 100 | | 412-00600 | 6" CONCRETE PAVEMENT | Square Yard | 100 | | 412-00800 | 8" CONCRETE PAVEMENT | Square Yard | 250 | | 412-01000 | 10" CONCRETE PAVEMENT | Square Yard | 100 | | 412-01200 | 12" CONCRETE PAVEMENT | Square Yard | 100 | | 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | Square Foot/Feet | 20 | | 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | Square Foot/Feet | 50 | | 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | Square Foot/Feet | 50 | | 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | Linear Foot/Feet | 50 | | 608-00000 | CONCRETE SIDEWALK | Square Yard | 50 | | 608-00010 | CONCRETE CURB RAMP | Square Yard | 50 | | 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | Square Foot/Feet | 90 | | 609-20000 | CONCRETE GUTTER OVERLAY | Linear Foot/Feet | 100 | | 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | Linear Foot/Feet | 160 | | 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | Linear Foot/Feet | 100 | | 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | Linear Foot/Feet | 100 | | 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | Linear Foot/Feet | 100 | | 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | Square Yard | 40 | **Line Items**: | Code | Description | Price | |---|---|---| | 01-21.13.01A | Water Treatment Equipment | $60,000.00 | | 01-21.13.01B | Traffic Control Rental Equipment, Devices, Etc | $100,000.00 | | 01-21.13.01C | All Construction Equipment | $380,000.00 | | 01-21.26.05A | Water Works | $400,000.00 | | 01-21.26.05B | Stone/Aggregates | $50,000.00 | | 01-21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | $200,000.00 | | 01-21.26.05D | Asphalt materials | $200,000.00 | | 01-21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | $100,000.00 | | 01-21.26.05F | Reinforced Polymer Mortar Pipe Materials | $20,000.00 | | 01-21.26.05G | Landscape Products/Materials | $30,000.00 | | 01-21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | $50,000.00 | | 01-21.26.05I | Erosion Control Measures (Materials Only) | $80,000.00 | | 01-21.26.05J | Water Treatment Filter Media, Consumables | $60,000.00 | **Line Items**: | Code | Description | Price | |---|---|---| | Textura Fee | Textura Fee Refer to BF-3 | $6,435.00 |

    Key dates

    1. May 19, 2026Published
    2. June 18, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.