SLED Opportunity · COLORADO · RIO BLANCO COUNTY
AI Summary
Rio Blanco County seeks bids for the Meeker Airport Fuel Farm Project to replace in-ground fuel tanks with aboveground storage and dispensing systems, including fuel management and safety components. Compliance with FAA, NFPA, EPA, and state regulations is required. Electronic bids due May 8, 2026.
Rio Blanco County is soliciting bids from qualified contractors for the Meeker Airport Fuel Farm Project at Coulter Field (EEO). The project consists of the replacement of the existing in-ground fuel system with a new aboveground fuel storage and dispensing facility. Work includes furnishing and installing two (2) 12,000-gallon UL-2085 aboveground storage tanks (AvGas and Jet-A), fuel dispensing systems, monitoring and fuel management systems, and all associated piping, safety, and control components. The contractor will be responsible for providing a complete, fully operational, and code-compliant system in coordination with owner-provided electrical and site infrastructure. The project must comply with all applicable FAA, NFPA, EPA, and State of Colorado regulations. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.1518.C2696501 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/04/2026 07:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: BidNet is the only accepted method for submitting bids. For Electronic Bid Submission: Electronic responses may be submitted online via BidNet at www.bidnetdirect.com//rio-blanco-county. Once logged into the system and viewing this notice, use the “Place a Bid” button at the top of the page. Follow the instructions to the end and ensure you receive a confirmation page that shows your response was successfully submitted. If you need assistance, please contact BidNet’s Vendor Support Department at 800-835-4603, Option 2. Do not wait until the last minute in case you encounter questions or technical issues. No proposals will be accepted after the time specified. **Owner Organization**: Rio Blanco County **Reference Number**: 0000421811 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/30/2026 01:00 PM EDT | Location: Online Teleconference | Event Note: Contractors can attend the recommended pre-bid meeting virtually: The Recommended Pre-Bid Meeting will be held on: April 30, 2026, 11:00 A.M.. All Contractors planning on attending the Recommended Pre-bid meeting virtually must email the bid administrator with the Subject Line: 2026 RBC Meeker Airport EEO Fuel Farm Project Pre-Bid, a meeting invite will be sent to with the link to attend the Pre-Bid Meeting.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.