SLED Opportunity · ILLINOIS · CITY OF NAPERVILLE, IL
AI Summary
Invitation for Bid for complete rehabilitation of sanitary sewer pipelines in Naperville, IL, including cured-in-place pipe lining and pressure testing of lateral connections.
It is the intent of this specification to provide for the complete rehabilitation of existing sanitary sewer pipelines. The complete rehab includes installation of either glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP) cured with ultraviolet light or resin-Saturated Felt CIPP Lining Cured with Steam or Hot Water, and Pressure Test and Grouting of lateral connections six feet (6’) upstream (post CIPP lining).
Please review the attached solicitation document for full details.
The City of Naperville, IL is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
It is the intent of this specification to provide for the complete rehabilitation of existing sanitary sewer pipelines. The complete rehab includes installation of either glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP) cured with ultraviolet light or resin-Saturated Felt CIPP Lining Cured with Steam or Hot Water, and Pressure Test and Grouting of lateral connections six feet (6’) upstream (post CIPP lining).
Please review the attached solicitation document for full details.
Please see the Attachments section for specifications and attachments.
| Release Project Date: | March 16, 2026 |
| Question Submission Deadline: | March 24, 2026, 12:00pm |
| Question Response Deadline: | March 30, 2026, 12:00pm |
| Bid Opening: | April 7, 2026, 2:00pm |
Tony Conn
Deputy Director
1200 W. Ogden Ave
Naperville, IL 60563
Zachary Martinez
Procurement Officer
400 S Eagle St
Naperville, IL 60540
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Confirm that your fee proposal is not attached in your Proposal and is attached separately here.
Please download the below documents, complete, and upload.
Please submit the requested document here.
Please download the below documents, complete, and upload.
Please submit the requested document here.
Please upload the requested document here.
Will there be an evaluation committee to review the proposals and score them based on weights and multiple criteria?
Select the information you would like display.
Q (Engineers Estimate or Budget ): What is the engineers estimate or owners budget for this project?
A: Not Available
Q (Completion Date): What is the projects final completion date?
A: As stated in the bid specifications Completion December 1, 2026. Final Invoice no later than December 15, 2026
Q (Grout): Would the owner consider Quadex I&I Guard-AG an approved chemical grout for laterals? Quadex I&I Guard-AG is a dry powder that readily dissolves in water to produce a solution of low viscosity. When catalyst is added to the I&I Guard-AG solution the grout mixture has about the same viscosity of water. As a result, it will penetrate soils similarly to water. The grout solution will penetrate all voids into which it is injected. When injected into the soil and cured it binds the soil particles together and forms a stiff impermeable gel thereby controlling the flow of groundwater.
A: Not for this project.
Q (DBE Requirements): Can the Owner please confirm if there are any DBE Requirements or good faith efforts that need to be completed for this project?
A: There are not any DBE requirements or good faith efforts requirements for this project.
Q (No subject): 1. Page 40 of 106 requires a “gravity leakage test.” The City of Naperville has removed this requirement on all previous CIPP projects when curing with steam. Can you please confirm a gravity leakage test is not required if steam curing is used? Please consider updating your specification for future projects
A: Gravity leakage testing not required for this project.
Q (No subject): • When it comes to testing and sealing the laterals under section 39 part A, it says to test and seal the first 6 ft of the lateral, but under c.6. it states an effective sealing length of 4 LF. Can you please clarify the effective sealing length within the lateral? • Can you confirm that work hours from 0700 – 1700 will be acceptable?
A: Lateral Sealing length is the first 4 feet of the service lateral. Hours of Operation are stated in the bid specification.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform