SLED Opportunity · UTAH · UNIVERSITY OF UTAH – U FACILITIES
AI Summary
University of Utah seeks bids for General Campus Road Maintenance 2026 including asphalt overlays, concrete repairs, and traffic control. Electronic bids due May 6, 2026. Estimated cost $254,713.
INVITATION TO BID Sealed bids will be received by the University of Utah (U Facilities) for: General Campus Road Maintenance 2026 University PROJECT #22945 Project Description: See Project Description and contact information on page 4. Construction Cost Estimate: $254,713.00 The bid documents will be available 5:00 PM on April 22, 2026 on the BidNet Direct website . A MANDATORY pre-bid meeting will NOT be held for this project. Bids are to be submitted electronically until 2:00 PM on May 6, 2026 through the BidNet Direct website. It is the sole responsibility of the contractor to ensure their bid reaches the BidNet Direct website before the closing date and time. There is no cost to the contractor to submit electronic bids the BidNet Direct website. Bids may require the uploading of attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files. For questions relating to BidNet Direct, please call 1-800-835-4603, Option 2 or email them at support@bidnet.com. Any bids over $100,000 will require a 100% Payment and Performance Bond to be included with the cost of your bid. Failure to provide this cost information may result in being deemed non-responsive. The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. PROJECT DESCRIPTION Contact Information: Project Specific Questions: Refer to Project Schedule for deadline. All questions are to be submitted through the BidNet Direct website. University Project Manager: Jenni Oman | 801-587-1760 | jenni.oman@utah.edu Project Description/Base Bid: Roadway maintenance on various roadways. Including but not limited to: traffic control, mill 2" depth, asphalt overlays, microsurfacing, pavement marking, concrete panel removal and replacement, concrete crack repair, and asphalt spot repairs. It should be assumed that all roadways will need to keep traffic moving, whether using flaggers or temporary lights. Hospital Valet Loop will need to be nights/weekend work to mitigate impacts. Additive Alternates: N/A Notes/Additional Information: N/A Construction Cost Estimate: $254,713.00 Liquidated Damages: $500.00 Tax Exempt: YES **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.2756265.2756267.C18581901 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/30/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Reference Number**: 0000421648 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Total Bid | Total Bid (please be sure to add the cost of the Payment and Performance Bonds to your total bid price). | Job | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.