SLED Opportunity · UTAH · UTAH
AI Summary
Utah state ITB for sewer pipe rehabilitation using CIPP lining, including installation of structural liners in sewer vaults and manholes, with associated dewatering and bypass pumping. Project starts March 31, 2026, and bids due April 21, 2026.
The WORK includes but is not limited to the following: Rehabilitation of sewer line by CIPP lining (254 LF 6-inch; 14,313 LF 8-inch; 1,019 LF 10”; 2,514 LF 12”; 2,047 LF 21”; 693 LF 24”; 4,581 LF 30”; 565 LF 36”; 1,522 LF 42”), installation of 1180 SF of cured in place structural liners in 5 sanitary sewer vaults and 5 sanitary sewer manholes, and all associated dewatering, bypass pumping, and lateral connections required to complete the work.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.