Active SLED Opportunity · TEXAS · HARRIS COUNTY

    26/0131 - ITB - Enclosed Channel Rehabilitation from Inwood Steet to the Upstream End for Harris County Flood Control

    Issued by Harris County
    countyITBHarris CountySol. 232831
    Open · 19d remaining
    DAYS TO CLOSE
    19
    due Jun 1, 2026
    PUBLISHED
    Invalid Date
    Posting date
    JURISDICTION
    Harris County
    county
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Harris County ITB for enclosed channel rehabilitation from Inwood Street to upstream end for flood control. Includes construction and maintenance services for sewer and storm drains. Key dates: open May 8, 2026; pre-bid May 19; questions due May 22; close June 1.

    Opportunity details

    Solicitation No.
    232831
    Type / RFx
    ITB
    Status
    Open
    Level
    county
    Published Date
    Invalid Date
    Due Date
    June 1, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    Harris County
    State
    Texas
    Agency
    Harris County

    Description

    Enclosed Channel Rehabilitation from Inwood Steet to the Upstream End for Harris County Flood Control - Project ID J131-00-00-X024

    Commodity Codes

    • Commodity Codes: NIGP 912 Construction Services, General (Incl. Maintenance And Repair Services) NIGP 913 Construction Services, Heavy (Incl. Maintenance And Repair Services) NIGP 91381 Maintenance and Repair, Sewer and Storm Drain, Including Removal

    Events & Timeline

    StatusEvent NameLocationDescriptionDatesMandatory
    OngoingOpen DateOnline PortalPosting date for the OpportunityMay 8th 2026, 11:00 AM CDTN/A
    UpcomingPre-Bid ConferenceMicrosoft TeamsThe Voluntary Pre-Bid conference will be held at 11:00AM on Tuesday, May 19, 2026, via Microsoft Teams. https://teams.microsoft.com/meet/299521362826385?p=pWRPSwfVnA2pcXClil Join the meeting now Meeting ID:299 521 362 826 385 Passcode:gP7cB6xU or call in (audio only) +1 281-985-1862, Phone Conference ID:639962827##May 19th 2026, 11:00 AM CDT - May 19th 2026, 12:00 PM CDTNo
    UpcomingQuestions Due DateOnline PortalDeadline to submit QuestionsMay 22nd 2026, 12:00 PM CDTN/A
    UpcomingClose DateOnline PortalDeadline for SubmissionsJun 1st 2026, 2:00 PM CDTN/A

    Requested Information

    Note: Template files for the items below (BidTables, Questionnaires) are available in the Attachments section of this opportunity.

    NameType# FilesRequirementInstructionsActions
    Estimated Contract ValueData Type: NumberN/ARequired
    Bid BondData Type: Yes/NoN/ARequired
    Bid CheckData Type: Yes/NoN/ARequired
    Copy of Bid Bond or Bid CheckFile Type: PDF (.pdf)MultipleRequired
    Bid Bond and Bid Check Return Authorization FormFile Type: PDF (.pdf)MultipleRequired
    Acceptance of General Requirements for BidsData Type: Yes/NoN/ARequired
    Bid AcknowledgementFile Type: PDF (.pdf)MultipleRequired
    Tax Residence CertificationFile Type: PDF (.pdf)MultipleRequired
    Form 1295 Certificate of Interested PartiesFile Type: PDF (.pdf)MultipleRequired
    Proof of InsuranceFile Type: PDF (.pdf)MultipleRequired
    References (Q-38BT)Questionnaire: Excel (.xlsx)1RequiredYou will need to fill out the provided Response Template for this Questionnaire.Download
    Contractor Qualifications (Q-59FL)Questionnaire: Excel (.xlsx)1RequiredYou will need to fill out the provided Response Template for this Questionnaire.Download
    MWBE Utilization Plan Commitment FormFile Type: PDF (.pdf)MultipleRequired
    Signed Letter of Intent for each MWBE firm specified in the Utilization Plan, and a copy of each MWBE’s current Letter of Certification from a state or local government or agency recognized by the CountyFile Type: PDF (.pdf)MultipleRequired
    Contractor Questionnaire (Q-78DT)Questionnaire: Excel (.xlsx)1RequiredYou will need to fill out the provided Response Template for this Questionnaire.Download
    BidTable (BT-37FS)BidTable: Excel (.xlsx)1RequiredYou will need to fill out the provided Response Template for this BidTable.Download
    BidTable - Item 19, Vendor Bid Maximum $1/DOData Type: Yes/NoN/ARequired
    Harris County Contractor and Worksite Safety Policies (Approved 1.29.26)File Type: PDF (.pdf)MultipleRequired
    Harris County Minimum Wage Policy and CertificationFile Type: PDF (.pdf)MultipleRequired
    Safety Record Questionnaire for Prime Contractors (Part A)File Type: PDF (.pdf)MultipleRequired
    Safety Record Questionnaire for Sub-Contractors (Part B)File Type: PDF (.pdf)MultipleRequired

    Attachments

    Key dates

    1. Invalid DatePublished
    2. June 1, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.