SLED Opportunity · TEXAS · HARRIS COUNTY
AI Summary
Harris County ITB for construction of a stormwater detention basin on South Mayde Creek near Grand Parkway. Includes pre-bid conference, submission deadlines, and extensive documentation requirements for flood control infrastructure.
Construction of Stormwater Detention Basin on South Mayde Creek near Grand Parkway - Phase 1 - for Harris County Flood Control Project ID U501-07-00-E002
| Status | Event Name | Location | Description | Dates | Mandatory |
|---|---|---|---|---|---|
| Ongoing | Open Date | Online Portal | Posting date for the Opportunity | Jun 5th 2026, 11:00 AM CDT | N/A |
| Upcoming | Pre-Bid Conference | Microsoft Teams | The Voluntary Pre-Bid conference will be held at 11:00AM on Tuesday, June 16, 2026, via Microsoft Teams. https://teams.microsoft.com/meet/283038729826146?p=MJAhQY6UF1Ak50aAIp Join the meeting now Meeting ID: 283 038 729 826 146 Passcode: vH9VG7Mc or call in (audio only) +1 281-985-1862, Phone Conference ID:471 145 330## | Jun 16th 2026, 11:00 AM CDT - Jun 16th 2026, 12:00 PM CDT | No |
| Upcoming | Questions Due Date | Online Portal | Deadline to submit Questions | Jun 18th 2026, 12:00 PM CDT | N/A |
| Upcoming | Close Date | Online Portal | Deadline for Submissions | Jul 6th 2026, 12:00 AM CDT | N/A |
Note: Template files for the items below (BidTables, Questionnaires) are available in the Attachments section of this opportunity.
| Name | Type | # Files | Requirement | Instructions | Actions |
|---|---|---|---|---|---|
| Estimated Contract Value | Data Type: Number | N/A | Required | ||
| Bid Bond | Data Type: Yes/No | N/A | Required | ||
| Bid Check | Data Type: Yes/No | N/A | Required | ||
| Copy of Bid Bond or Bid Check | File Type: PDF (.pdf) | Multiple | Required | ||
| Acceptance of General Requirements for Bids and Grant Requirements | Data Type: Yes/No | N/A | Required | ||
| Attachment A - Bid & Addenda Acknowledgement | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment C - Certification of Lobbying | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment D - Statement of Offeror Qualifications | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment E - Subcontractor Listing Form | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment F - References | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment G - Contractor Profile | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment H - Bid Bond Confirmation and Bid Check Authorization Form | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment L - Certification of Compliance | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment CC – Non-Hub MWBE Utilization Plan Commitment Form | File Type: PDF (.pdf) | Multiple | Required | ||
| Signed Letter of Intent for each MWBE firm specified in the Utilization Plan, and a copy of each MWBE’s current Letter of Certification from a state or local government or agency recognized by the County | File Type: PDF (.pdf) | Multiple | Required | ||
| Certificate of Interested Parties (Form 1295) – Pursuant to Texas Government Code § 2252.908, Offerors must complete and submit Form 1295, Certificate of Interested Parties, prior to the proposal deadline using the following website: https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm. Offerors must file Form 1295 electronically with the Texas Ethics Commission using the online filing application, and then print a copy of the form filed with the Commission and submit the signed copy. | File Type: PDF (.pdf) | Multiple | Required | ||
| Bidder and Subcontractor Licensing / Certifications – Bidder must submit any applicable licensing and/or certifications required for the completion of the scope of services under this IFB. | File Type: PDF (.pdf) | Multiple | Required | ||
| Certification or documentation that Bidder, or its subcontractor(s), is HUB-certified by the Texas Comptroller of Public Accounts or the local MWBE office in their jurisdiction. | File Type: PDF (.pdf) | Multiple | Required | ||
| Conflict of Interest Questionnaire – Bidders who contract with Harris County must disclose Bidder’s or its employees’ affiliation, business relationship, employment, family relationship, or provision of gifts that might cause a conflict of interest with Harris County. The questionnaire (provided by the Texas Ethics Commission at www.ethics.state.tx.us) must be filed with Harris County not later than the 7th business day after the date Bidder becomes aware of facts that require the statement to be filed. | File Type: PDF (.pdf) | Multiple | Required | ||
| Statement of Conflicts – A statement of conflicts the Bidder or key employees may have regarding these services. | File Type: PDF (.pdf) | Multiple | Required | ||
| System for Award Management results – Bidder must include verification that your company as well as the company’s principal is not debarred through the System for Award Management (www.SAM.gov). Bidder must enclose a print out of the search results that includes the record date. | File Type: PDF (.pdf) | Multiple | Required | ||
| Sample Insurance Certificate – Bidder must provide a sample Insurance Certificate which adheres to the Minimum Insurance Requirements shown under Attachment M (does not supersede the “Hold Harmless” provision). | File Type: PDF (.pdf) | Multiple | Required | ||
| Bid Pricing Sheets (BT-27QW) | BidTable: Excel (.xlsx) | 1 | Required | You will need to fill out the provided Response Template for this BidTable. | Download |
| Attachment Z - Harris County Minimum Wage Policy and Certification | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment HH - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26) | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment II - Safety Record Questionnaire for Prime Contractors (Part A) | File Type: PDF (.pdf) | Multiple | Required | ||
| Attachment JJ - Safety Record Questionnaire for Sub-Contractors (Part B) | File Type: PDF (.pdf) | Multiple | Optional |
File Type Description Date Created Actions Attachment A - Bid Addenda Acknowledgement.pdf Documentation Bid & Addenda Acknowledgement Aug 15th 2025, 1:34 PM CDT Download Attachment AA - Report File.pdf Documentation Report File May 28th 2026, 1:46 PM CDT Download Attachment B - Bid Schedule - Pricing Form.pdf Documentation Bid Schedule - Pricing Form Jun 4th 2021, 10:19 AM CDT Download Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf Documentation Non-HUB MWBE Goal Participation Information Packet May 28th 2026, 1:55 PM CDT Download Attachment C - Certification Regarding Lobbying.pdf Documentation Certification Regarding Lobbying Jun 4th 2021, 10:19 AM CDT Download Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf Documentation Non-HUB MWBE Utilization Plan Commitment Form Dec 17th 2025, 4:15 PM CST Download Attachment D - Statement of Bidder Qualifications.pdf Documentation Statement of Bidder Qualifications Jun 4th 2021, 10:19 AM CDT Download Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf Documentation MWBE Trucking Procedure Compliance Packet Feb 28th 2025, 9:01 AM CST Download Attachment F - References.pdf Documentation References Jun 4th 2021, 10:20 AM CDT Download Attachment FF - Heat Protection Safety Requirements.pdf Documentation Heat Protection Safety Requirements Jul 24th 2024, 12:41 PM CDT Download Attachment G - Contractor Profile.pdf Documentation Contractor Profile Apr 1st 2025, 2:13 PM CDT Download Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf Documentation Bid Bond Confirmation and Check Authorization Form Oct 27th 2021, 11:08 AM CDT Download Attachment HH - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf Documentation Harris County Contractor and Worksite Safety Policies May 28th 2026, 2:40 PM CDT Download Attachment I - Performance Bond for Public Works over 100,000.pdf Documentation Performance Bond for Public Works over 100,000 Jun 4th 2021, 10:20 AM CDT Download Attachment II - Safety Record Questionnaire for Prime Contractors (Part A) .pdf Documentation Safety Record Questionnaire for Prime Contractors May 28th 2026, 2:32 PM CDT Download Attachment JJ - Safety Record Questionnaire for Sub-Contractors (Part B) .pdf Documentation Safety Record Questionnaire for Sub-Contractors May 28th 2026, 2:33 PM CDT Download Attachment K - Payment Bond.pdf Documentation Payment Bond Jun 4th 2021, 10:21 AM CDT Download Attachment L - Certification of Compliance with Federal Standards Requirements (1).pdf Documentation Certification of Compliance with Federal Standards Requirements Read more... May 28th 2026, 2:03 PM CDT Download Attachment M - Harris County Minimum Insurance Requirements (Construction) .pdf Documentation Harris County Minimum Insurance Requirements (Construction) Read more... May 28th 2026, 2:04 PM CDT Download Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf Documentation Workers Compensation Insurance Coverage Rule 110.110 Read more... Jun 4th 2021, 10:30 AM CDT Download Attachment O - Davis Bacon Wage Decision.pdf Documentation Davis Bacon Wage Decision Jun 2nd 2026, 2:52 PM CDT Download Attachment P - Required Contract Provisions (1).pdf Documentation Attachment P Jun 2nd 2026, 2:55 PM CDT Download Attachment Q - Section 3 Bid Requirements.pdf Documentation Section 3 Bid Requirements Jun 2nd 2026, 2:49 PM CDT Download Attachment S - Plans and Drawings .pdf Documentation Plans and Drawings May 28th 2026, 2:17 PM CDT Download Attachment U - Project Manual.pdf Documentation Project Manual May 28th 2026, 2:15 PM CDT Download Attachment V - Project Signs Plaques.pdf Documentation Project, Signs, and Plaques May 28th 2026, 2:12 PM CDT Download Attachment W - GLO Compliance Package.pdf Documentation GLO Compliance Package Jun 2nd 2026, 2:48 PM CDT Download Attachment Z - Harris County Minimum Wage Policy and Certification.pdf Documentation Harris County Minimum Wage Policy and Certification Oct 22nd 2025, 12:03 PM CDT Download Federal IFB General Conditions and Specifications - Construction.pdf Documentation Specifications Jun 4th 2026, 7:00 PM CDT Download Harris County Minimum Wage FAQs as of December 2025 - Final.pdf Documentation Harris County Minimum Wage FAQs as of December 2025 - Final Read more... Dec 23rd 2025, 2:19 PM CST Download
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.