Construction contract for two pumped nutrient reduction wetlands in Calhoun, Iowa, including clearing, excavation, installation of solar powered lift stations, water control structures, and seeding. Completion by December 2026 with seeding in mid-2027.
Completion Dates: Construction: December 31, 2026; Seeding: May 15, 2027 (Structure Seeding) & June 30, 2027 (Buffer Seeding) 2 sites - 1 contract CAL883229BN - North This is a pumped nutrient reduction wetland. Work involves selective clearing, excavation and grading, installation of lift stations with solar powered pumps, force main, tile, inlet risers, water control structures, drawdown pipes, riprap and seeding. The estimated construction cost range is $ 375,000 to $ 475,000. CAL883229BS - South This if a pumped nutrient reduction wetland. Work involves selective clearing, excavation and grading, installation of lift station with solar powered pump, force main, tile, inlet risers, water control structures, drawdown pipes, riprap and seeding. The estimated construction cost range is $ 175,000 to $ 275,000.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.