Construction services for a Tile Zone nutrient reduction wetland in Iowa including clearing, excavation, pipe installation, concrete work, and seeding. Estimated cost $250K-$350K.
Completion Dates: Construction: November 15, 2026; Seeding: May 15, 2027 (Structure) and June 30, 2027 (Buffer) This is a Tile Zone nutrient reduction wetland. Work involves selective clearing, excavation, grading, reinforced concrete pipe (RCP) installation, high density polyethylene (HDPE) dual wall pipe installation, tied concrete block mat (Flexamat Plus or engineer approved equal), concrete manholes and seeding. The estimated cost range between $250,000 and $350,000.