    Sandy Springs seeks contractors for detention pond improvements including access enhancement, debris removal, erosion control, tree clearing, and traffic maintenance. Contractor responsible for utility locates, permits, and daily reporting. Project starts Feb 5, 2026, with bids due by Mar 9, 2026.

    Opportunity details

    Solicitation No.
    221080
    Type / RFx
    RFQ
    Status
    Open
    Level
    local
    Published Date
    Invalid Date
    Due Date
    March 9, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Sandy Springs
    State
    Georgia
    Agency
    Sandy Springs

    Description

    This project involves improvements to an existing detention pond and the associated inlets/outlet. Specifically, the goal of this project is to create better access to the pond and its inlets and outlets as well as to remove accumulated debris and sediment. Utility locates necessary for project completion shall be the responsibility of the contractor. Stormwater infrastructure within the project limits including existing pond inlets and outlets should be located prior to construction. All trees onsite should also be located and identified prior to construction. Clearing and stump grinding of all trees as necessary for construction of the pond access path will be the responsibility of the contractor. If traffic maintenance is needed it will be the contractor’s responsibility. Erosion and sediment control measures will need to be installed and maintained for the project duration. Disturbed areas will be stabilized with sod or specified planting.Material hauled off must be dried prior to leaving the project site. Quantities of material haul off are in dried cubic yards. Wet material shall not be hauled onto the City Right-of-Way. Material drying location shall be up to the contractor (within the limits of disturbance). The contractor is responsible for linking to the permitted City Project as well as applying for a Right-of-Way Utility Permit. Detailed daily reports, including photographs, will be required as part of this project.

    Key dates

    1. Invalid DatePublished
    2. March 9, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.