SLED Opportunity · GEORGIA · SANDY SPRINGS
AI Summary
Sandy Springs seeks contractors for Mountain Creek Road Maintenance Phase 2 involving concrete pipe installation, headwall replacement, stream bed protection, handrail installation, site grading, and erosion control.
This project involves the installation of Centrifugally Cast Concrete Pipe (CCCP) to approximately 90 linear feet (LF) of 60" Corrugated Metal Pipe (CMP), removal and installation of the downstream headwall, installation of stream bed protection in the downstream section, installation of black coated handrail, site grading, and erosion control.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.