Active SLED Opportunity · IOWA · IOWA
AI Summary
Construction of a nutrient reduction wetland in Iowa including earthwork, steel sheet pile, tile and water control structure installation, riprap, and seeding. Estimated cost $450K-$550K. Completion by mid-2027.
This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure and seeding. This project includes about 12,950 cubic yards of earthwork, installation of 932 square feet of steel sheet pile, water control structure, 2,500 linear feet (LF) of tile installation, 59 LF of drawdown pipe, 532 tons of riprap, 106 cubic yards of concrete grout and 26.3 acres of seeding. The estimated construction cost range for this project is $450,000 to $550,000. Completion Dates: Construction: June 15, 2027 Seeding: June 30, 2027 (Buffer Seeding must be done within seeding period) September 15, 2027 (Structure Seeding must be done within seeding period)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.