SLED Opportunity · OREGON · CITY OF BEND
AI Summary
City of Bend seeks contractors for the Azalia and Windsor Sewer Project involving installation of gravity and pressure sewer pipelines, manholes, traffic control, and street restoration. Estimated cost $2.4M-$3.1M.
The project consists of construction of new gravity and pressure sewer mains and laterals through areas primarily served by private septic systems. The scope of work includes, but is not limited to, trenching and installation of approximately 2,355-LF of 8-inch gravity sewer pipeline and 1,675-LF of 3-inch pressure sewer pipeline at depths of approximately 5 - 19 feet, sewer manholes, gravity and pressure sewer services, temporary traffic control, street reconstruction, and general right-of-way restoration.The Engineer’s estimate is between $2,400,000 and $3,100,000 .
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.