Active SLED Opportunity · OHIO · CITY OF FINDLAY
AI Summary
City of Findlay seeks contractors for Sixth Street Waterline Replacement Phase II involving installation of waterlines, pavement repair, storm sewer work, and sidewalk replacement. Project funded by City Water Fund with compliance requirements including EEO, prevailing wages, and domestic steel use.
Sixth Street Waterline Replacement Phase II, Project No. 35760100 This project consists of installing a new 10-inch C909 waterline on Sixth Street, running on the north side of the roadway, from Brookside Drive to Blanchard Avenue. This project shall consist of, but is not limited to, 3,410 LF of 10-inch C909 waterline, 65 LF of 16-inch C905 waterline, 470 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, hydrant assembly, waterline abandonments, misc. fittings, 50 LF of 8-inch storm sewer, removing and replacing a storm catch basin, sidewalk replacement and seeding and mulching. This project is funded by City of Findlay Water Fund. Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. Final Completion Date: September 4, 2026 Engineer’s Estimate: $884,605.00
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.