Active SLED Opportunity · SOUTH CAROLINA · HORRY COUNTY GOVERNMENT

    480 Myrtle Greens Drive, Unit A Conway - Single Family Rehabilitation

    Issued by Horry County Government
    countyRFQHorry County GovernmentSol. 9037142852
    Open · 6d remaining
    DAYS TO CLOSE
    6
    due Jun 9, 2026
    PUBLISHED
    May 26, 2026
    Posting date
    JURISDICTION
    Horry County
    county
    NAICS CODE
    236118
    AI-classified industry

    AI Summary

    Horry County Government seeks quotes for single family rehabilitation at 480 Myrtle Greens Drive, Unit A, Conway, including HVAC installation, flooring, electrical work, and related construction services. Mandatory pre-bid conference on June 2, 2026. Bids due June 9, 2026.

    Opportunity details

    Solicitation No.
    9037142852
    Type / RFx
    RFQ
    Status
    Active
    Level
    county
    Published Date
    May 26, 2026
    Due Date
    June 9, 2026
    NAICS Code
    236118AI guide
    Agency
    Horry County Government

    Description

    Single family rehabilitation of 480 Myrtle Greens Drive, Unit A, Conway. **Project Type**: QR - Quote Request (Informal) **Source ID**: PU.MU.USA.715279.C17940726 **Piggyback Contract**: No **Question Acceptance Deadline**: 06/04/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Community Development **Reference Number**: 0000425543 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Required Forms Packet | Required forms | Yes | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 06/02/2026 10:00 AM EDT | Location: 480 Myrtle Greens Drive, Unit A, Conway | Event Note: Non-attendees are not permitted to bid. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next HOME-480 Myrtle Greens Drive Unit A Code Description UOM Qty Heating & Air-2 Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-3 Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-4 Materials to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-5 Labor to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-6 Materials to install copper line set from air handler to condensing unit. Unit 1 Heating & Air-7 Labor to install copper line set from air handler to condensing unit. Unit 1 Living Rm/Dining Rm/Hallway-8 Materials to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-9 Labor to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-10 Materials to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-11 Labor to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-12 Materials to install 3/4" round trim Linear Foot/Feet 140 Living Rm/Dining Rm/Hallway-13 Labor to install 3/4" round trim Linear Foot/Feet 140 General Conditions-14 Materials to provide for trash removal Unit 1 General Conditions-15 Materials to provide a permit Unit 1 | Next HOME-480 Myrtle Greens Drive Unit A Code Description UOM Qty Heating & Air-2 Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-3 Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-4 Materials to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-5 Labor to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-6 Materials to install copper line set from air handler to condensing unit. Unit 1 Heating & Air-7 Labor to install copper line set from air handler to condensing unit. Unit 1 Living Rm/Dining Rm/Hallway-8 Materials to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-9 Labor to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-10 Materials to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-11 Labor to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-12 Materials to install 3/4" round trim Linear Foot/Feet 140 Living Rm/Dining Rm/Hallway-13 Labor to install 3/4" round trim Linear Foot/Feet 140 General Conditions-14 Materials to provide for trash removal Unit 1 General Conditions-15 Materials to provide a permit Unit 1 | Heating & Air-2 | Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | Heating & Air-3 | Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | Heating & Air-4 | Materials to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | Heating & Air-5 | Labor to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | Heating & Air-6 | Materials to install copper line set from air handler to condensing unit. | Unit | 1 | Heating & Air-7 | Labor to install copper line set from air handler to condensing unit. | Unit | 1 | Living Rm/Dining Rm/Hallway-8 | Materials to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-9 | Labor to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-12 | Materials to install 3/4" round trim | Linear Foot/Feet | 140 | Living Rm/Dining Rm/Hallway-13 | Labor to install 3/4" round trim | Linear Foot/Feet | 140 | General Conditions-14 | Materials to provide for trash removal | Unit | 1 | General Conditions-15 | Materials to provide a permit | Unit | 1 | | | | Next HOME-480 Myrtle Greens Drive Unit A Code Description UOM Qty Heating & Air-2 Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-3 Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-4 Materials to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-5 Labor to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-6 Materials to install copper line set from air handler to condensing unit. Unit 1 Heating & Air-7 Labor to install copper line set from air handler to condensing unit. Unit 1 Living Rm/Dining Rm/Hallway-8 Materials to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-9 Labor to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-10 Materials to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-11 Labor to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-12 Materials to install 3/4" round trim Linear Foot/Feet 140 Living Rm/Dining Rm/Hallway-13 Labor to install 3/4" round trim Linear Foot/Feet 140 General Conditions-14 Materials to provide for trash removal Unit 1 General Conditions-15 Materials to provide a permit Unit 1 | Heating & Air-2 | Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | Heating & Air-3 | Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | Heating & Air-4 | Materials to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | Heating & Air-5 | Labor to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | Heating & Air-6 | Materials to install copper line set from air handler to condensing unit. | Unit | 1 | Heating & Air-7 | Labor to install copper line set from air handler to condensing unit. | Unit | 1 | Living Rm/Dining Rm/Hallway-8 | Materials to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-9 | Labor to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-12 | Materials to install 3/4" round trim | Linear Foot/Feet | 140 | Living Rm/Dining Rm/Hallway-13 | Labor to install 3/4" round trim | Linear Foot/Feet | 140 | General Conditions-14 | Materials to provide for trash removal | Unit | 1 | General Conditions-15 | Materials to provide a permit | Unit | 1 | | | Heating & Air-2 | Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | | Heating & Air-3 | Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | | Heating & Air-4 | Materials to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | | Heating & Air-5 | Labor to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | | Heating & Air-6 | Materials to install copper line set from air handler to condensing unit. | Unit | 1 | | Heating & Air-7 | Labor to install copper line set from air handler to condensing unit. | Unit | 1 | | Living Rm/Dining Rm/Hallway-8 | Materials to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-9 | Labor to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-12 | Materials to install 3/4" round trim | Linear Foot/Feet | 140 | | Living Rm/Dining Rm/Hallway-13 | Labor to install 3/4" round trim | Linear Foot/Feet | 140 | | General Conditions-14 | Materials to provide for trash removal | Unit | 1 | | General Conditions-15 | Materials to provide a permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next HOME-480 Myrtle Greens Drive Unit A Code Description UOM Qty Heating & Air-2 Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-3 Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. Unit 1 Heating & Air-4 Materials to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-5 Labor to install new breakers, interior disconnect, thermostat and wiring. Unit 1 Heating & Air-6 Materials to install copper line set from air handler to condensing unit. Unit 1 Heating & Air-7 Labor to install copper line set from air handler to condensing unit. Unit 1 Living Rm/Dining Rm/Hallway-8 Materials to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-9 Labor to remove & dispose of carpet and pad. Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-10 Materials to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-11 Labor to install vinyl plank flooring Square Foot/Feet 418 Living Rm/Dining Rm/Hallway-12 Materials to install 3/4" round trim Linear Foot/Feet 140 Living Rm/Dining Rm/Hallway-13 Labor to install 3/4" round trim Linear Foot/Feet 140 General Conditions-14 Materials to provide for trash removal Unit 1 General Conditions-15 Materials to provide a permit Unit 1 | Heating & Air-2 | Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | Heating & Air-3 | Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | Heating & Air-4 | Materials to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | Heating & Air-5 | Labor to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | Heating & Air-6 | Materials to install copper line set from air handler to condensing unit. | Unit | 1 | Heating & Air-7 | Labor to install copper line set from air handler to condensing unit. | Unit | 1 | Living Rm/Dining Rm/Hallway-8 | Materials to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-9 | Labor to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 418 | Living Rm/Dining Rm/Hallway-12 | Materials to install 3/4" round trim | Linear Foot/Feet | 140 | Living Rm/Dining Rm/Hallway-13 | Labor to install 3/4" round trim | Linear Foot/Feet | 140 | General Conditions-14 | Materials to provide for trash removal | Unit | 1 | General Conditions-15 | Materials to provide a permit | Unit | 1 | | | Heating & Air-2 | Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | | Heating & Air-3 | Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | | Heating & Air-4 | Materials to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | | Heating & Air-5 | Labor to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | | Heating & Air-6 | Materials to install copper line set from air handler to condensing unit. | Unit | 1 | | Heating & Air-7 | Labor to install copper line set from air handler to condensing unit. | Unit | 1 | | Living Rm/Dining Rm/Hallway-8 | Materials to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-9 | Labor to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-12 | Materials to install 3/4" round trim | Linear Foot/Feet | 140 | | Living Rm/Dining Rm/Hallway-13 | Labor to install 3/4" round trim | Linear Foot/Feet | 140 | | General Conditions-14 | Materials to provide for trash removal | Unit | 1 | | General Conditions-15 | Materials to provide a permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Heating & Air-2 | Materials to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | | Heating & Air-3 | Labor to install a 2-ton split HVAC system, to include new equipment pad & air handler & pan. Connect to existing duct. Per code. | Unit | 1 | | Heating & Air-4 | Materials to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | | Heating & Air-5 | Labor to install new breakers, interior disconnect, thermostat and wiring. | Unit | 1 | | Heating & Air-6 | Materials to install copper line set from air handler to condensing unit. | Unit | 1 | | Heating & Air-7 | Labor to install copper line set from air handler to condensing unit. | Unit | 1 | | Living Rm/Dining Rm/Hallway-8 | Materials to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-9 | Labor to remove & dispose of carpet and pad. | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 418 | | Living Rm/Dining Rm/Hallway-12 | Materials to install 3/4" round trim | Linear Foot/Feet | 140 | | Living Rm/Dining Rm/Hallway-13 | Labor to install 3/4" round trim | Linear Foot/Feet | 140 | | General Conditions-14 | Materials to provide for trash removal | Unit | 1 | | General Conditions-15 | Materials to provide a permit | Unit | 1 |

    Key dates

    1. May 26, 2026Published
    2. June 9, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.