SLED Opportunity · SOUTH CAROLINA · HORRY COUNTY GOVERNMENT
AI Summary
Horry County Government seeks quotes for single-family home rehabilitation at 488 McNeil Chapel Road, Longs, SC. Scope includes roofing, windows, doors, siding, kitchen and bathroom repairs, HVAC installation, and general construction services. Mandatory prebid conference on April 1, 2026. Bids due April 15, 2026.
Single family rehabilitation of 488 McNeil Chapel Road, Longs **Project Type**: QR - Quote Request (Informal) **Source ID**: PU.MU.USA.715279.C17940726 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/06/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Community Development **Reference Number**: 0000417500 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Required Forms Packet | Required forms | Yes | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 04/01/2026 10:00 AM EDT | Location: 488 McNeil Chapel Road, Longs, SC 29568 | Event Note: Non-attendees are not permitted to bid **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next HOME-488 McNeil Chapel Rd Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Next HOME-488 McNeil Chapel Rd Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Code Description UOM Qty | Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | General Conditions-42 | Materials to provide for permit | Unit | 1 | | | | Next HOME-488 McNeil Chapel Rd Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Code Description UOM Qty | Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | General Conditions-42 | Materials to provide for permit | Unit | 1 | | | Code Description UOM Qty | | Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | General Conditions-42 | Materials to provide for permit | Unit | 1 | | | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | | General Conditions-42 | Materials to provide for permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next HOME-488 McNeil Chapel Rd Code Description UOM Qty Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Code Description UOM Qty | Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | General Conditions-42 | Materials to provide for permit | Unit | 1 | | | Code Description UOM Qty | | Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | General Conditions-42 | Materials to provide for permit | Unit | 1 | | | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | | General Conditions-42 | Materials to provide for permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | Roofing-02 Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-03 Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum Square 20 Roofing-04 Materials to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Roofing-05 Labor to remove and replace rotten plywood on roof deck Square Foot/Feet 128 Windows & Doors-06 Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-07 Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code Unit 11 Windows & Doors-08 Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-09 Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. Unit 1 Windows & Doors-10 Materials to install a mid-view storm door on rear entry Unit 1 Windows & Doors-11 Labor to install a mid-view storm door on rear entry Unit 1 Windows & Doors-12 Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Windows & Doors-13 Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. Unit 1 Siding-14 Materials to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-15 Labor to remove and install vinyl siding as needed to facilitate window installation Square 6 Siding-16 Materials to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-17 Labor to install aluminum trim coil on three (3) columns on front porch Unit 3 Siding-18 Materials to remove and reinstall shutters Unit 8 Siding-19 Labor to remove and reinstall shutters Unit 8 Kitchen-20 Materials to install new P-trap for kitchen sink Unit 1 Kitchen-21 Labor to install new P-trap for kitchen sink Unit 1 Kitchen-22 Materials to install new plywood for sink base bottom Unit 1 Kitchen-23 Labor to install new plywood for sink base bottom Unit 1 Kitchen-24 Materials to replace 24" light fixture above sink Unit 1 Kitchen-25 Labor to replace 24" light fixture above sink Unit 1 Kitchen-26 Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Kitchen-27 Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. Unit 1 Hall Bathroom-28 Materials to install two (2) comfort height commodes , include wax ring and supply line Unit 2 Hall Bathroom-29 Labor to install two (2) comfort height commodes, include wax ring and supply line Unit 2 Hall Bathroom-30 Materials to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Hall Bathroom-31 Labor to patch popcorn texture on ceiling and paint Square Foot/Feet 132 Guest Bedroom-32 Materials to replace ceiling fan/light fixture Unit 1 Guest Bedroom-33 Labor to replace ceiling fan/light fixture Unit 1 Heating & Air-34 Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code Unit 1 Heating & Air-35 Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. Unit 1 Heating & Air-36 Materials to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-37 Labor to install new breakers, disconnect & thermostat for HVAC system Unit 1 Heating & Air-38 Materials to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 Heating & Air-39 Labor to install a new copper line set w/ cover from air handler to condensing unit. Unit 1 General Conditions-40 Materials to provide for trash removal Unit 1 General Conditions-41 Materials to provide for porta-john Unit 1 General Conditions-42 Materials to provide for permit Unit 1 | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | General Conditions-42 | Materials to provide for permit | Unit | 1 | | | Roofing-02 | Materials to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | | Roofing-03 | Labor to remove existing shingles and felt down to roof deck. Install synthetic felt underlayment, drip edge, ridge vent, plumb, electrical and vent boots per manufacturer's recommendations. Use architectural shingles rated for 110 mph wind minimum | Square | 20 | | Roofing-04 | Materials to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | | Roofing-05 | Labor to remove and replace rotten plywood on roof deck | Square Foot/Feet | 128 | | Windows & Doors-06 | Materials to install single-hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | | Windows & Doors-07 | Labor to install single- hung vinyl windows with screens. Install trim on interior to close up gaps if needed. Per Code | Unit | 11 | | Windows & Doors-08 | Materials to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-09 | Labor to install pre-hung 9-lite door on back entry. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-10 | Materials to install a mid-view storm door on rear entry | Unit | 1 | | Windows & Doors-11 | Labor to install a mid-view storm door on rear entry | Unit | 1 | | Windows & Doors-12 | Materials to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | | Windows & Doors-13 | Labor to install a pre-hung 6-panel steel door for utility room. Include interior casing and lockset. | Unit | 1 | | Siding-14 | Materials to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | | Siding-15 | Labor to remove and install vinyl siding as needed to facilitate window installation | Square | 6 | | Siding-16 | Materials to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | | Siding-17 | Labor to install aluminum trim coil on three (3) columns on front porch | Unit | 3 | | Siding-18 | Materials to remove and reinstall shutters | Unit | 8 | | Siding-19 | Labor to remove and reinstall shutters | Unit | 8 | | Kitchen-20 | Materials to install new P-trap for kitchen sink | Unit | 1 | | Kitchen-21 | Labor to install new P-trap for kitchen sink | Unit | 1 | | Kitchen-22 | Materials to install new plywood for sink base bottom | Unit | 1 | | Kitchen-23 | Labor to install new plywood for sink base bottom | Unit | 1 | | Kitchen-24 | Materials to replace 24" light fixture above sink | Unit | 1 | | Kitchen-25 | Labor to replace 24" light fixture above sink | Unit | 1 | | Kitchen-26 | Materials to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | | Kitchen-27 | Labor to replace exhaust hood above stove. Connect to existing electrical/non-ducted. | Unit | 1 | | Hall Bathroom-28 | Materials to install two (2) comfort height commodes , include wax ring and supply line | Unit | 2 | | Hall Bathroom-29 | Labor to install two (2) comfort height commodes, include wax ring and supply line | Unit | 2 | | Hall Bathroom-30 | Materials to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | | Hall Bathroom-31 | Labor to patch popcorn texture on ceiling and paint | Square Foot/Feet | 132 | | Guest Bedroom-32 | Materials to replace ceiling fan/light fixture | Unit | 1 | | Guest Bedroom-33 | Labor to replace ceiling fan/light fixture | Unit | 1 | | Heating & Air-34 | Materials to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code | Unit | 1 | | Heating & Air-35 | Labor to install a 2-ton split HVAC system. Include equipment pad and pan for air handler, connect to existing duct. Per code. | Unit | 1 | | Heating & Air-36 | Materials to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | | Heating & Air-37 | Labor to install new breakers, disconnect & thermostat for HVAC system | Unit | 1 | | Heating & Air-38 | Materials to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | | Heating & Air-39 | Labor to install a new copper line set w/ cover from air handler to condensing unit. | Unit | 1 | | General Conditions-40 | Materials to provide for trash removal | Unit | 1 | | General Conditions-41 | Materials to provide for porta-john | Unit | 1 | | General Conditions-42 | Materials to provide for permit | Unit | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.