Active SLED Opportunity · IOWA · CITY OF CEDAR RAPIDS
AI Summary
City of Cedar Rapids seeks bids for installation of a 16-inch ductile iron water main across the Cedar River at 7th Avenue. The project includes construction, testing, and restoration with an estimated cost of $2.56M. Key milestone completion by January 15, 2027, and final completion by April 30, 2027.
The Work generally consists of the installation of a 16-inch ductile iron water main across the Cedar River by open cut installation at 7th Avenue to replace the existing 16-inch ductile iron water main at the 8th Avenue Bridge Cedar River Crossing. located at 7th Avenue From Valor Way SW, across Cedar River, to 1st St SE. The Engineer’s opinion of probable cost is $2,560,000. Early Start Date: Upon Receipt of Notice to Proceed Late Start Date: N/A Milestones: Milestone 1 (01/15/2027) - Complete Construction, Disinfection, Hydrostatic Testing, And Connection Of Water Main From Sta 100+00 To Sta. 110+10.62. Restoration Of River Bed To Pre-Construction Elevations And Removal And Disposal Of Causeway Fill And Excess Native Material From The Project Site, In Advance Of The Eighth Avenue Bridge Project. Final Completion: Completion Date - 04/30/2027
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.