Invitation for Bid to reconstruct parking lot between Cain Hall and National Judicial College at UNR. Scope includes grading, asphalt paving, curb and sidewalk replacement, lighting, fencing, utility vault lid replacement, irrigation, and landscaping. Project estimated at $700K-$800K with prevailing wage requirements.
BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: This is a prevailing wage project. Reconstruct parking lot between Cain Hall and the National Judicial College. Work to include grading, asphalt paving, curb and sidewalk replacement, exterior lighting, fencing, utility vault lid replacement, and irrigation and landscaping. UNR Project#: #24RPR02824 Labor Commissioner #: WA-2026-129 SPWD Project #: 26-B011 Estimated Cost Range: $700,000 to $800,000 Liquidated Damages: $500/day Special Considerations: Traffic and pedestrian signage will need to be provided during construction. Fiber utility vault lid will need to be replaced without damaging existing fiber line. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Contractors Pollution Liability, and an Equipment Floater will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 18, 2026" and shall be fully complete by "August 21, 2026."
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.