SLED Opportunity · NEVADA · NEVADA

    9073 Addendum 4 (UNR - Renovate Dome at Fleischmann Planetarium Room 0022

    Issued by Nevada
    stateITBNevadaSol. 19262
    Closed
    STATUS
    Closed
    due Feb 2, 2026
    PUBLISHED
    Dec 30, 2025
    Posting date
    JURISDICTION
    Nevada
    state
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Invitation for Bid for interior renovations at UNR's Fleischmann Planetarium Dome Theater, including mechanical, electrical, and architectural improvements with a project cost of $620K-$720K. Work starts May 4, 2026, with completion by October 9, 2026.

    Opportunity details

    Solicitation No.
    19262
    Type / RFx
    ITB
    Status
    Issued
    Level
    state
    Published Date
    December 30, 2025
    Due Date
    February 2, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: This is a prevailing wage project. Interior Renovations to the Planetarium Dome Theater including removal of existing projector screen, infill center opening, architectural finish improvements. Scope includes new basement server room, electrical and mechanical improvements along with a new exterior chiller. UNR Project#: #24RNV02853 Labor Commissioner #: WA-2026-163 SPWD Project #: 26-B022 Estimated Cost Range: $620,000 to $720,000 Liquidated Damages: $200 per day. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Installation Floater to cover on-site storage and installation of the materials, Equipment Insurance coverage for mobile equipment, forklift, scissor lift, crane etc., (if rented include rental equipment insurance if needed) will be required. Builder's Risk Insurance will be required. If a crane will be used then either the Installation Floater must cover equipment on the hook, or separate Rigging Insurance to cover any lifting operations utilizing a crane will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 4, 2026". Interior Dome and basement renovations to be completed by "June 12, 2026" and the entire project shall be fully complete by "October 9, 2026".

    Key dates

    1. December 30, 2025Published
    2. February 2, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.