SLED Opportunity · NEVADA · NEVADA
AI Summary
Invitation for Bid for removal and replacement of speaker and subwoofer system at Mackay Stadium, UNR. Includes installation of Q-Sys audio control system. Project requires crane use and prevailing wage compliance. Estimated cost $70K-$170K. Work scheduled June 1 to July 31, 2026.
BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: This is a prevailing wage project. Removal and replacement of speaker and subwoofer system for Mackay Stadium. Add Q-Sys system to control audio sound system. The system will need to allow 24 inputs UNR Project#: #26MNC03756 Labor Commissioner #: WA-2026-384 SPWD Project #: Not Required Estimated Cost Range: $70,000 to $170,000 Liquidated Damages: $500 per day Special Considerations: Crane will be needed for removal of old speakers and placement on new speakers on roof. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Riggers liability OR Installation Floater will be required. Builders Risk Insurance will be required if the award amount equals or exceeds $100,000. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "June 1, 2026" and shall be fully complete by "July 31, 2026."
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.