SLED Opportunity · NEVADA · NEVADA

    9107 Addendum 2 (UNR - Renovate Room at William N. and Myriam Pennington Medical Education Building Room 0014

    Issued by Nevada
    stateITBNevadaSol. 20049
    Closed
    STATUS
    Closed
    due Jun 18, 2026
    PUBLISHED
    May 28, 2026
    Posting date
    JURISDICTION
    Nevada
    state
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Invitation for Bid to renovate the student lounge at the William N. and Myriam Pennington Medical Education Building in Reno, NV. Estimated cost $70K-$170K. Work starts July 6, 2026, and completes by September 25, 2026. Electronic bid submission required.

    Opportunity details

    Solicitation No.
    20049
    Type / RFx
    ITB
    Status
    Issued
    Level
    state
    Published Date
    May 28, 2026
    Due Date
    June 18, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: Renovate student lounge at William N. and Myriam Pennington Medical Education Building. UNR Project#: #25RNV03395 Labor Commissioner #: WA-2026-400 SPWD Project #: 26-B053 Estimated Cost Range: $70,000 to $170,000 Liquidated Damages: $500 per day Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Pollution Liability, and an Installation Floater will be required. Builder's Risk will be required if the award amount equals or exceeds $100,000. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Special Considerations: Contractor is responsible for any parking permits. A staging area will be provided, the Construction Project Manager will coordinate this effort with the awarded Contractor. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "July 6, 2026" and shall be fully complete by "September 25, 2026."

    Key dates

    1. May 28, 2026Published
    2. June 18, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.