Construction services for the Salmon Creek Treatment Plant UV System Replacement including canopy modification, concrete channel construction, UV lamp system installation, and diving work. Estimated cost $5.3M.
The construction of all components of the Salmon Creek Treatment Plant UV System Replacement.Work includes disassembly and modification or demolition of an existing canopy at the UV facility, construction of a concrete channel (Channel 2) parallel to the existing UV disinfection channel (Channel 1), installation of a UV lamp system in Channel 2 while maintaining the existing UV system in service in Channel 1. Once UV Disinfection Channel 2 is fully commissioned, existing UV equipment in Channel 1 will be demolished, and a new UV lamp system will be installed while maintaining operation of Channel 2. Diving is required to accomplish the work. Installation of the modified canopy or provision of a new canopy over the facility as shown on the Drawings will follow. The two channels will be hydraulically connected through pipes upstream and downstream of the UV equipment.The engineer's estimate for this project is $5.3M.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.