Active SLED Opportunity · GEORGIA · GEORGIA

    Access Control System at Jackson County Jail

    Issued by Jackson County Board Of Commissioners
    stateRFPgeorgiaSol. PE-67800-NONST-2026-000000042
    Open · 18d remaining
    DAYS TO CLOSE
    18
    due Jun 2, 2026
    PUBLISHED
    Apr 23, 2026
    Posting date
    JURISDICTION
    georgia
    state
    NAICS CODE
    561621
    AI-classified industry

    AI Summary

    Jackson County Board of Commissioners seeks a comprehensive access control system for the jail, including monitoring and control of doors, intercoms, cameras, lighting, and paging, with required infrastructure and training services.

    Opportunity details

    Solicitation No.
    PE-67800-NONST-2026-000000042
    Type / RFx
    RFP
    Status
    Open
    Level
    state
    Published Date
    April 23, 2026
    Due Date
    June 2, 2026
    NAICS Code
    561621AI guide
    Jurisdiction
    georgia
    State
    georgia
    Agency
    Jackson County Board Of Commissioners

    Description

    Jail Access Control System Functional Requirements The proposed system shall be capable of monitoring, controlling, and integrating the following components: ¿ Swing Doors (345) ¿ DPS Monitoring Points (56) ¿ Gate Control Points (3) ¿ Sliding Doors (11) ¿ Intercom Stations (428) ¿ Paging Zones (33) ¿ IP Camera Integration via RTSP (130) ¿ County standard: Avigilon ¿ Panic Alarm Inputs (22) ¿ Watch Tour Monitoring Points (29) ¿ Card Readers (25) ¿ County standard: Avigilon ¿ Lighting Control ¿ Television (TV) Control System Components and Infrastructure Requirements The following components are anticipated to be required as part of the proposed solution. Equivalent alternatives must be approved by the County prior to submission: ¿ Workstations: Dell workstations with 27¿ Dell monitors and APC UPS battery backup, fully integrated with the County¿s existing EcoStruxure IT monitoring environment, for security system operations ¿ Server Infrastructure: Dell rack-mounted server with APC UPS, fully integrated into the existing EcoStruxure IT environment, supporting both server and network switching infrastructure ¿ Relay Control Modules: Three (3) modules to interface with and control existing relays to remain in service ¿ System Exchanges: Fifteen (15) units ¿ Intercom Master Stations: Thirteen (13) units ¿ Low Voltage Power Supplies: Ten (10) units Card Access Control System ¿ Enclosures: Three (3) ¿ Card Readers: Twenty-five (25) ¿ Controller Boards (¿Main System Boards¿): Three (3) ¿ Expansion Modules: Nineteen (19) ¿ Access Control Server: One (1) Documentation and Deliverables The selected firm shall provide the following: ¿ Complete shop drawings ¿ Equipment layout drawings ¿ Device termination drawings ¿ Comprehensive training for County staff and system administrators ¿ All shipping and freight costs to the project site

    Key dates

    1. April 23, 2026Published
    2. June 2, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.