SLED Opportunity · FLORIDA · FLORIDA

    Addendum#1: BDC19-25-26 Key Largo Hammock - Valois Canal Plug

    Issued by Department of Environmental Protection (DEP)
    stateInvitation to BidfloridaSol. ITB-15151
    Closed
    STATUS
    Closed
    due Mar 3, 2026
    PUBLISHED
    Feb 19, 2026
    Posting date
    JURISDICTION
    florida
    state
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Invitation to Bid for construction services at Dagny Johnson Key Largo Hammock Botanical State Park involving the Valois Canal Plug project. Includes addendum clarifying rock source requirements and specifications.

    Opportunity details

    Solicitation No.
    ITB-15151
    Type / RFx
    Invitation to Bid
    Status
    OPEN
    Level
    state
    Published Date
    February 19, 2026
    Due Date
    March 3, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    florida
    State
    florida
    Agency
    Department of Environmental Protection (DEP)

    Description

    February 19, 2026

     

    NOTICE TO APPLICANTS

    ADDENDUM NO. ONE (1)

     

    Dagny Johnson Key Largo Hammock Botanical State Park - Valois Canal Plug

    DEP BID NO. BDC19-25/26

     

                  TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

    NOTICE

     

    It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

     

    _______________________________________

    Signature of Contractor and Date

     

    The following statements supersede & supplement the corresponding items in the specifications & drawings:

     

    1. Question:  General Note 6.1, on Sheet CM—1.1, states that proposed rock sources must be approved for use by the engineer prior to commencement of work. Is there a pre-approved list of sources that are already approved by the engineer? 

    Answer: The rock source needs to meet the requirements on 6.2.

     

    2. Question:  General Note 6, on Sheet CM—1.1, does not specify the type of rock to be used. Is the rock granite, limestone, Cocina, or another type? The type of rock can dramatically increase the costs due to transportation of the material from its source. 

    Answer: The rock physical characteristics are shown in Section 6.2. For example, granite would have a specific gravity greater than the minimum required (minimum requirement for specific gravity is 2.25, granite would be at 2.6 to 2.8 depending on the quarry, this specific gravity is close to that of limestone).

     

    In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

    Key dates

    1. February 19, 2026Published
    2. March 3, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.