SLED Opportunity · OKLAHOMA · DMOND

    Addendum 1 (Covell Road and Air Depot Boulevard Street Improvement Project

    Issued by Dmond
    localRFQDmondSol. 4792
    Closed
    STATUS
    Closed
    due Mar 4, 2026
    PUBLISHED
    Feb 11, 2026
    Posting date
    JURISDICTION
    Dmond
    local
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Sealed bid opportunity for street improvements on Covell Road and Air Depot Boulevard in Edmond, OK, including utility coordination, erosion control, and specified network equipment installation.

    Opportunity details

    Solicitation No.
    4792
    Type / RFx
    RFQ
    Status
    Issued
    Level
    local
    Published Date
    February 11, 2026
    Due Date
    March 4, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    Dmond
    Agency
    Dmond

    Description

    --- Q&A --- Q1: On the North side of Covell Road from stations 818+00 to 822+00 there are several underground utility lines. Additionally, there is a major electrical drop continuing to the north in the utility easement at approximate station 820+25 that is servicing the commercial building. Have any of these utility lines bee located and depths verified by the engineer or service companies? Has it been determined whether or not the utility lines are in conflict with designed stormsewer? What is the city's procedure and/or policy if conflicts with utilities are encountered on the project? Will the 120 calendar day completion time be increased for the redesign, relocation, and/or resolutions of the conflict(s) time period? A1: "Different Typical Sections are included in the plans to account for utilities. An additional note will be included in the Addendum addressing utility and service lines." Submitted: 2/24/2026 11:22:25 AM (CT) Q2: Is Concrete Flowable Fill required around the inlets? A2: Standard backfill will be used unless otherwise approved or directed by the engineer. Submitted: 2/23/2026 12:52:40 PM (CT) Q3: Can erosion control items and solid slab sodding items be removed from the substantial completion item list? A3: No Submitted: 2/23/2026 12:51:27 PM (CT) Q4: Is it possible that the City of Edmond will award base bid without including Alternate No. 1? A4: It is the intent to award the base bid and alternate together however not guaranteed Submitted: 2/23/2026 12:50:12 PM (CT) Q5: Can the model of desired ethernet switch be provided? A5: Answer: The Cisco switch model number shall be IE-3400-8P2S-E with IEM-3300-14TS2 module and four 1 GB SFP modules. The bid document specification (page 58) shall be updated accordingly with the Addendum. Submitted: 2/13/2026 09:56:04 AM (CT)

    Key dates

    1. February 11, 2026Published
    2. March 4, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.