Active SLED Opportunity · KANSAS · JOHNSON COUNTY

    Addendum 1 (Douglas L. Smith Middle Basin Asset Renewal Project

    Issued by Johnson County
    countyRFQJohnson County Sol. 2032
    Open · 23d remaining
    DAYS TO CLOSE
    23
    due Jul 16, 2026
    PUBLISHED
    Jun 9, 2026
    Posting date
    JURISDICTION
    Johnson County
    county
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Invitation for Bid for construction and improvements at Johnson County's Middle Basin Asset Renewal Project, including multiple building renovations, pump station upgrades, and new sodium hypochlorite storage facilities.

    Opportunity details

    Solicitation No.
    2032
    Type / RFx
    RFQ
    Status
    Issued
    Level
    county
    Published Date
    June 9, 2026
    Due Date
    July 16, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Johnson County
    State
    Kansas
    Agency
    Johnson County

    Description

    The Work includes the furnishing of the labor, materials, equipment and services for construction of the new process area MB-17 Sodium Hypochlorite Storage and improvements made in the following existing buildings and site work improvements (yard piping, yard electrical, paving and grading, erosion control, and general restoration): MB-2 Solids Processing Building, MB-3 Gravity Thickener Building and Fermenter, MB-7 Administration Building, MB-8 Settled Sewage Pump Station, MB-10 Sodium Hypochlorite Building, MB-11 UV Disinfection Building, and MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building. The work consists of the following:· The Work in MB-2 Solids Processing Building includes the replacement of grit classifiers and conveyors, demolition of an existing belt filter press, and structural beam and elevated slab repairs. The Work in MB-3 Gravity Thickener Building and Fermenter includes the replacement of a motor control center and various process valves.· The Work in MB-7 Administration Building includes the installation of a new natural gas powered standby generator and automatic transfer switch.· The Work in MB-8 Settled Sewage Pump Station includes primary sludge pump modifications and the replacement of the primary scum pumps, settled sewage pumps, and sidestream control valves.· The Work in MB-10 Sodium Hypochlorite Building includes the demolition of existing sodium hypochlorite storage tanks, piping, and pumps.· The Work in MB-11 UV Disinfection Building includes the relocation of an existing flow meter on the plant effluent water pumping system.· The Work in MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building includes the replacement of primary sludge pumps, odor control fans, building make-up air unit, and the electrical room air conditioning unit.· The Work associated with new process area MB-17 Sodium Hypochlorite Storage includes the construction of new sodium hypochlorite storage tanks and fill stations, an access roadway, and a pre-engineered fiberglass reinforced building. Within the pre-engineered building, new excess flow chemical metering pumps are to be installed along with the relocated plant effluent water chemical metering pump skid. All questions and bids shall be submitted through IonWave.

    Key dates

    1. June 9, 2026Published
    2. July 16, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.