SLED Opportunity · MISSOURI · SPRINGFIELD PUBLIC SCHOOLS
AI Summary
Construction of an athletic field and track at Reed Academy, Springfield Public Schools. Includes sod installation, demolition, and electrical work. Bid form updates and addenda forthcoming.
The Work consists of the construction of an athletic field and track for Reed Academy at Lafayette Park. --- Q&A --- Q1: Unit prices are not shown on the bid form, will these be required? A1: Updated bid form will show unit prices, will be included in an upcoming addendum Submitted: 3/3/2026 09:16:10 AM (CT) Q2: Outside of the fenced in area that has sod indicated there will be demolition of the existing track, is this are to be re-sod, or is hydroseed sufficient, and will the plans indicate this? A2: Any area that is disturbed due to the construction shown on the plans is required to be replaced with sod. Hydroseed will not be accepted on this project as an alternative to sod. Submitted: 3/3/2026 08:20:43 AM (CT) Q3: Will there be a site electrical page included in the plans to indicate the re-routing of the light poles. A3: Will be shown on electrical sheets that will be included in an upcoming addendum Submitted: 3/3/2026 08:19:02 AM (CT)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.